Laserfiche WebLink
INSPECTION REPORT <br /> / _ Date 0/%118' Permit: 1318b �1--) <br /> Contractor: D <br /> Owner: ixth SD <br /> Site Addres 2, ,, , \ °l er &.'4- 17?i <br /> TYPE OF INSPECTION REQUE 'Tr= <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Naili ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceili rid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ilding Final ❑Gas Pipe Final� )❑�/HWWT Final <br /> OTHER O NSULTATION:___e.nr Tv� / "I.� 'al2/ <br /> I ./..0 2.-, ./..07, .1 <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hhournotice required <br /> hiffA0r6ig <br /> /1A - Pug1;a , , r <br /> Ft-ern; se <br /> - <br /> V ptiao /_-.0©3.S,)_. <br /> , /--/,.4-6 <br /> ....._________ <br /> Inspector: Date:),____E_____ <br /> EIR(10/06) DATABAR,INC. <br />