Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 5/30/2019 15:10 <br /> Issued By NSO NIELSEN,SCOTT O. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 3/21/2019 <br /> Fund 401 Account 5 Program 710 Function 118 Activity 675 <br /> Program <br /> Title INSTALL.75 INCH PRV 18930 BADKE RD 710118675 <br /> Work Order No 20190935 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 3/21/2019 Time 08:23 Original WO Billing <br /> Problem Details <br /> Structure ID StrTyp Activity Compl Date Comments <br /> TS24865002 WASRVC YES 3/22/2019 <br /> Address 18930 BADKE RD <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 18930 BADKE RD <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 2 30.298 03/25/2019 PM <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 2 30.554 03/25/2019 PM <br /> M ADAP34000147 ADAPTER 3/4 MIP X 3/4 RIBBED INSERT FOR IPS PE PIPE 1 7.894 03/25/2019 PM <br /> M BUSH34118547 BUSHING HEX 1 X 3/4 NPT BRASS 1 2.857 03/25/2019 PM <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.78 03/25/2019 PM <br /> M COUP34004847 COUPLING 3/4 STRAIGHT SWIVEL METER NUT X 3/4 FIP 1 12.235 03/25/2019 PM <br /> M ELLO34154947 ELBOW 3/4 NPT 45 DEG STREET BRASS(1/8 BEND) 1 4.085 03/25/2019 PM <br /> M ELLO34104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.835 03/25/2019 PM <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .954 03/25/2019 PM <br /> M VALV34008348 VALVE METER 3/4 LOCKWING ANGLE METER VALVE SWVLNUT X 3/4FIP 2 81.556 03/25/2019 PM <br /> Total Material Cost (J 6 ) <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK 1 25.62 03/25/2019 <br /> NA N/A 3/4"PRV 1 324.94 03/25/2019 <br /> NA N/A WIRE CLAMP 4 6.32 03/25/2019 <br /> Total NA Cost $356.88 <br /> Total Cost $542.94 <br />