Laserfiche WebLink
INSPECTION REPORT <br /> 4 Date e2Pa JIB__ Permit: 1-7 12-0b5 <br /> Contractor: PI4MINK <br /> Owner: E 71T-er10_Gbh - <br /> Site Address: 4112. l 5 baker Dr_ <br /> T PE OF INSPECTION REQUESTED <br /> ELECTRICAL DING MECHANICAL PLUMBING <br /> ❑Temp Service UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑ oting ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑`Gas Pipe Final III HWT Final <br /> OTHE' •R CONSULTATION:_ AZ541r"0706 <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION El <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Ctf`oLA-. CC.\S OgOe- M rnS `Cr.€i' <br /> Inspector: /�/ Date: / / TABAR, <br /> INC. <br />