My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4613 BAKER DR 2019-06-10
>
Address Records
>
BAKER DR
>
4613
>
4613 BAKER DR 2019-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 2:15:41 PM
Creation date
6/10/2019 2:15:36 PM
Metadata
Fields
Template:
Address Document
Street Name
BAKER DR
Street Number
4613
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/22/2019 Page <br /> City of Everett <br /> 11:28:04AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1712-003 Site Address 4613 BAKER DR <br /> Applied 12/5/2017 Applicant ROBERT MECH BOARD AND VELLUM ARCH Lot <br /> Approved 2/27/2018 Owner GREENOUGH JEFFERY W&LISA A Block <br /> Issued 2/28/2018 Contractor PHOENIX CONSTRUCTION INC Tract <br /> Parent Permit No. Description SFR REMODEL,ADD DECK <br /> Notes <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> 4/20/2018 4/20/2018 BLDG KMK APPROVAL Interior footings OK <br /> 02-FOOTING/SETB to pour <br /> 5/31/2018 5/31/2018 PLUMB SDP APPROVAL As noted Perimeter drains in basement will conenct <br /> 02-GROUND to the sewer through a backwater valve per <br /> Paul McKee. <br /> 6/29/2018 6/29/2018 BLDG DWF APPROVAL OK to cover <br /> 07-EXTERIOR <br /> 7/27/2018 7/27/2018 PLUMB SDP APPROVAL 1.Call for shower pans when ready <br /> 03-ROUGH IN <br /> 7/27/2018 7/27/2018 GAS 01-ROUGH IN SDP APPROVAL <br /> 8/7/2018 8/7/2018 BLDG TMB APPROVAL Add ground rods due to insufficient footing <br /> 01-CONSULTATIO area. <br /> 8/20/2018 8/20/2018 MECH 04-ROUGH SDP APPROVAL Rangehood exhaust <br /> IN at final <br /> 8/29/2018 8/29/2018 BLDG DWF CORRECTION Not ready,need electrical inspection for <br /> 08-FRAMING smoke alarm hard-wiring. <br /> 8/31/2018 8/31/2018 BLDG DWF APPROVAL As noted Contractor to install positive connection <br /> 08-FRAMING post-beam-seismic.Inspection on insulation <br /> install. <br /> 9/6/2018 9/6/2018 BLDG DWF APPROVAL Approved as noted Contractor to complete"air seal"and fire <br /> 11-INSULATION stop floor/ceiling basement holes.Header <br /> (hallway) <br /> Then OK to cover(drywall). <br /> Need to post temporary site address. <br /> Provide a copy of insulation certification at <br /> building final. <br /> 3/6/2019 3/6/2019 PLUMB 06-FINAL SDP APPROVAL As noted: Phone:435-210-1463 <br /> (3/6/2019 3:01 PM SDP) <br /> Backwater valve requires an access door in <br /> cabinet bottom. <br /> 3/6/2019 3/6/2019 GAS 03-FINAL SDP APPROVAL <br /> 3/6/2019 3/6/2019 MECH 06-FINAL SDP APPROVAL As noted (3/6/2019 3:01 PM SDP) <br /> Anchor the stove. <br /> 3/8/2019 3/8/2019 BLDG 15-FINAL DWF CORRECTION Phone:435-210-1463 <br /> (3/8/2019 1:55 PM DWF) <br /> Install hand railing on stairways 4 or more <br /> treads. <br /> Install landing 36"depth off patio,north <br /> side. <br /> All hand-railing needs to return to wall as <br /> per IRC. <br /> Post permanent site address as per 319.1 <br /> IRC <br /> 4/17/2019 4/17/2019 BLDG 15-FINAL DWF APPROVAL as noted Phone:435-210-1463 <br /> (4/17/2019 9:52 AM DWF) <br /> Install one handrail on front steps as <br /> discussed with owner. <br /> In process. <br /> 4/17/2019 4/17/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 YSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.