Laserfiche WebLink
4/22/2019 City of Everett Page <br /> 11:28:20AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1808-029 Site Address 4613 BAKER DR <br /> Applied 8/3/2018 Applicant DAVE OR MARCO Lot <br /> Approved 8/3/2018 Owner GREENOUGH JEFFERY W&LISA A Block <br /> Issued 8/7/2018 Contractor SUNSHINE ELECTRIC INC Tract <br /> Parent Permit No. C1712-003 Description REWIRE 95%OF SFR <br /> Notes <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 8/28/2018 8/28/2018 ELEC 03-ROUGH SKB APPROVAL Contractor bonding waste and old water <br /> IN main being changed to plastic. <br /> 8/30/2018 8/30/2018 ELEC 03-ROUGH SKB APPROVAL <br /> IN <br /> 11/2/2018 11/2/2018 ELEC 03-ROUGH SKB APPROVAL As noted Floor heat in 2 bathrooms OK. <br /> IN Note:Contractor to move the heat tape in <br /> main floor bath to manufacturers spec <br /> -check GFCI breaker at final. <br /> 3/6/2019 3/6/2019 ELEC 09-FINAL SKB CORRECTION Phone:425-478-1777 <br /> (3/6/2019 2:16 PM SKB) <br /> Provide GFI protection for the microwave <br /> receptacle above the sink and the receptacle <br /> within 6 feet of the sink.Install box <br /> extension where boxes are not flush with <br /> combustibles such as the master <br /> bedroom.gfci protect the all laundry. <br /> Provide GFCI protection to outside front <br /> east facing receptacles. <br /> 3/8/2019 3/8/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 3/8/2019 3/8/2019 ELEC 09-FINAL SKB APPROVAL AM inspection requested <br /> Phone:425-478-1777 <br /> INSP12CRWS YS TEM S <br />