My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7016 BEVERLY BLVD 2019-06-10
>
Address Records
>
BEVERLY BLVD
>
7016
>
7016 BEVERLY BLVD 2019-06-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2019 3:06:59 PM
Creation date
6/10/2019 3:06:39 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7016
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC Date: 10/21/2015 <br /> �R►KS PERMIT Public Works Permit#: PW1510-039 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> ,�� Everett, WA 98201 <br /> Planning Reference#: SS15-002 <br /> (425)257-8810 <br /> Public Works Fee$: $ 913.41 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EBERLE TROY EBERLE TROY <br /> 14024 62ND AVE SE 14024 62ND AVE SE <br /> EVERETT WA 98208 EVERETT WA 98208 <br /> PHONE: 2068527376 PHONE: 2068527376 <br /> TAX PARCEL ID# 00392800100700 SITE ADDRESS: 7016 BEVERLY BLVD <br /> SITE DEVELOPMENT FOR 2-LOT SHORT PLAT <br /> PUBLIC WORKS PERMIT FOR REQUIRED SITE DEVELOPMENT ASSOCIATED WITH TROY EBERLE SHORT PLAT <br /> 1202-2015-002. <br /> BEVERLY HILLS DIV 1 BLK 001 D-00 1 <br /> BLDG & LAND ON FDP: LOT 7 REFER <br /> TO 3928-001-007-0103 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications for Development. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 m <br /> 4. Site Civil Work to be done per drainage report and plans approved (as noted) by the <br /> City of Everett Public Works Department dated 5/12/2016 and SWPPP Report approved,.., w <br /> on 4/24/2016. --i o <br /> '` <br /> w-i r7.7 i Eng ;Ie., <br /> 5. Water and Sewer services must be installed and stubbed to each lot prior to fin3 ;W'•6.7; <br /> approval of short plat. `'' I"I <br /> 7n cdf) <br /> 6. Any grading/fill on-site shall be done so as to not impact the surrounding properties. �` <br /> 7. City streets are to be kept clear of dirt and debris at all times during construction. ` ' IIrt. co <br /> - <br /> Dust suppression and street cleaning must occur as directed by the Public Works *t <br /> Inspector. holt <br /> 8. As-builts of storm, sanitary sewer , and water systems will be required to be ei 142, <br /> submitted per City Design and Construction Standards and Specifications for .®'� ;N.3(.r,1-4e = �' Z <br /> Development. : :��,,x„77' `=' <br /> 9. Traffic Mitigation in the amount of$2400.00 will be due at the time of Short Plat F-` � =' <br /> --i L7'E-7r <br /> Recording. See permit#PW1605-016 at that time. <br /> Public Works Fee Breakdown: <br /> Grading/Fill/Excavation $90.00 <br /> Paving $45.00 <br /> PW Plan Review $259.47 <br /> PW Site Inspection $518.94 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> / City of Everett from any and all claims for damages,costs,expenses,or <br /> �r/J� 000/6 causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Approved for Construction remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date /'' 579/6 <br /> Approved as Constructed .'.natu�: pplicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.