Laserfiche WebLink
INTRODUCTION <br /> This report is intended as satisfying the Minimum Requirements 1 through 5 for the City <br /> of Everett Stormwater Management Manual. <br /> Minimum Requirement#1: Stormwater Site Plan Preparation <br /> See attached Existing Conditions, Site Drainage Plan and SWPPP/TESCP Plan as <br /> prepared by Trepanier Engineering dated 2/20/2015. <br /> The project is for the construction of a two lot Short Plat that will retain an existing single <br /> family residence on Lot# 1 and will provide an additional single-family residence and <br /> attached garage on Lot#2. Access to the lots will be provided by a shared easement for <br /> ingress egress and utilities along Beverly BLVD with a street address of 7016 Beverly <br /> BLVD. <br /> Minimum Requirement#2: Construction Stormwater Pollution Prevention <br /> C- SWPPs Elements#1-12 are required. <br /> 1. Clearing limits will be marked; <br /> 2. Construction entrance will utilize the two existing driveway accesses. <br /> 3. There is a minor potential for stormwater erosion since the adjacent property <br /> (Lot 1) is downstream of the new lot. The intent is to install a silt-fencing and <br /> provide ground cover for all denuded areas. <br /> 4. Sediment controls will be shown on the plan and consists of the existing <br /> driveway entrance, silt fences and replanting grass/lawn on all disturbed <br /> areas. <br /> 5. Soil stabilization notes will be added to the plans; <br /> 6. The site has no significant slopes to protect. <br /> 7. See#4 above; INS1t?r.L PRoiv 11oN ftl" DOII)NS7RE/Nn s1 ueTV 2es. <br /> 8. The downstream storm system will be protected by providing splash blocks at <br /> all roof downspout locations and dispersing flows to the natural ground. <br /> During construction CB protection will be provided at the existing <br /> downstream Catch Basin. <br /> 9. Standard construction notes will be added to the plans;there does not appear <br /> to be a problem with controlling pollutants; <br /> 10. No dewatering issues are anticipated; <br /> 11. Standard construction plans and erosion control notes will be added to the <br /> plan. These notes require maintaining the BMPs. <br /> 12. The project is small, so no phasing, seasonal work limitations or <br /> clearing/grading restrictions were deemed necessary. <br />