Laserfiche WebLink
5/16/2019 Page 1 <br /> City of Everett <br /> 9:32:53AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1602-011 Site Address 7523 BROADWAY <br /> Applied 2/16/2016 Applicant ADAIR ENTERPRISES LLC Lot 5 <br /> Approved 4/8/2016 Owner ADAIR ENTERPRISES LLC Block <br /> Issued 4/19/2016 Contractor ADAIR ENTERPRISES LLC Tract <br /> Parent Permit No. RB1602-001 Description NEW SFR-RESIDENTIAL BASIC RB1602-001-ADAIR PLAN <br /> Notes LANDSCAPE INSPECTION REQUIRED PRIOR TO FINAL.CONTACT TERESA WELDON @ <br /> 425-257-7281 TO SCHEDULE AN INSPECTION. <br /> Scheduled Completed Type Inspector Result Remarks Inspector's Comments <br /> FINAL PLANNING TFW need landscape <br /> inspection <br /> 4/28/2016 4/28/2016 UFER Ground DWF Approval See notes Contractor installed UFER ground,and <br /> verified set backs. <br /> 4/28/2016 4/28/2016 Footing DWF Approval Footings as per OK for concrete <br /> plans,see notes <br /> 5/5/2016 5/5/2016 Foundation KMK Con Reqd See notes Please obtain approval from the City of <br /> Everett Building Dept for the changes in <br /> foundation wall height and provide <br /> engineering for retaining wall. <br /> Note: <br /> 1)Rebar grid on house wall is#4,10"x10" <br /> and at garage is#4,48"x48". <br /> 2)Footing is 18"with 2#4 horizontal and <br /> hook barb. <br /> 5/17/2016 5/17/2016 Underfloor KMK Con Reqd See notes Please complete correction 5/5 <br /> (engineering). <br /> 6/8/2016 6/8/2016 Footing KMK Approval <br /> 6/8/2016 6/8/2016 Foundation KMK Approval See notes Received engineering for change in <br /> foundation. <br /> 6/13/2016 6/13/2016 MechRoughln DXW Approval See notes Rough in Mechanical OK as noted:Fix <br /> holes in top of fireplace insulatin shield. <br /> 6/13/2016 6/13/2016 PlbgRoughIn DXW Approval <br /> 6/13/2016 6/13/2016 GasPiping DXW Approval Rough in gas pipe <br /> OK,18 PSI <br /> 6/29/2016 6/29/2016 Framing KMK Approval OK to insulate <br /> 7/6/2016 7/6/2016 InsulBldg KMK Approval OK to rock <br /> 7/13/2016 7/13/2016 DrywallNailing KMK Approval OK to mud&tape <br /> 8/19/2016 8/19/2016 Final Plbg DXW Approval <br /> 8/19/2016 8/19/2016 Final Mech DXW Con Reqd See notes See page 8 MFG book 12"clearence to <br /> inside corner on exhaust termination 2" <br /> clearence to wall for tank complete <br /> condensate to funnel <br /> 8/19/2016 8/19/2016 GasPipeFinal DXW PartialApproval <br /> 8/22/2016 8/22/2016 Final Mech DXW Approval Duct test left at site. <br /> 8/23/2016 8/23/2016 Final Bldg KMK Approval <br /> 8/23/2016 8/23/2016 Mark Final** KMK Approval <br /> 2/26/2019 2/26/2019 CERTIFICATE OF TKJ CORRECTION Need planning final <br /> OCCUPANCY approval <br /> 5/16/2019 5/16/2019 ADMIN OTHER KLC OTHER OK to archive <br /> without C of 0 per 7 <br /> T.J. <br /> INSP12 CRN'SYSTEM <br />