Laserfiche WebLink
4 "r <br /> swppp narrative <br /> The intent of this section is to provide the information necessary to support the engineering <br /> plans in order to implement a design that will; reduce, eliminate or prevent the discharge of <br /> stormwater pollutants, meet or exceed the water quality and sediment management <br /> standards for the County and State, and prevent adverse impacts to the receiving waters <br /> for this project. <br /> A. SITE GRADING/EROSION CONTROL RISK ASSESSMENT <br /> Area proposed to be cleared/worked: 0.39 acres <br /> Average slope for the site: 17% (Area of Disturbance Only) <br /> Erosion Hazard of Soil Low <br /> Critical Areas downslope Yes <br /> Site is upstream of an ESA Stream No <br /> Based on the above information and the fact that the area of the site to be disturbed is <br /> moderate to steep and construction site runoff will pass through silt fencing or other <br /> perimeter filtration features prior to leaving the site, and that if site conditions warrant, <br /> additional BMP's can be implemented as corrective measures the Risk Category for this site <br /> is Low Risk. <br /> B. SWPPP MINIMUM ELEMENTS <br /> 1: Preserve Vegetation and Mark Clearing Limits <br /> The first step in the construction process is for the contractor to fence the limits of <br /> clearing/disturbance (BMP C103) prior to any other construction activity. The engineering <br /> plans locate and provide the square footages for the areas of grading, clearing, impervious <br /> surfaces and un-disturbed areas on the proposed site. As much of the natural vegetation <br /> as possible will be preserved on this project (BMP C101). The entire parcel will be flagged <br /> for disturbance. <br /> 2: Establish Construction Access <br /> The SWPPP calls for the proposed construction entrance (BMP C105)to be installed as the <br /> second step after the staking of clearing limits. At this time winter work is expected during <br /> the wet season. <br /> 3: Control Flow Rates <br /> This project is below the thresholds requiring flow control for the project. <br /> Ocean Ave SFR 17-0802 <br /> Revised: October 2017 Page 6 <br />