t x <br /> than %" of rain in a 24-hour period. Also, BMPs shall be inspected on a weekly basis even <br /> if site work is not occurring. <br /> 12: Manage the Project <br /> It will be the responsibility of the Contractor and Developer to manage this project and <br /> coordinate with the City Inspector and Engineer. <br /> Inspection and Monitoring: <br /> Site inspections shall be done by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. The person must have skills to first assess the <br /> site conditions and construction activities that could impact the quality of stormwater, and <br /> second assess the effectiveness of erosion and sediment control measures used to control <br /> the quality of stormwater discharges. Whenever inspection and/or monitoring reveals that <br /> the BMPs identified in the Construction SWPPP are inadequate, due to the actual discharge <br /> of or potential to discharge a significant amount of any pollutant, appropriate BMPs or design <br /> changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP: <br /> The construction SWPPP shall be retained on-site or within reasonable access to the site. <br /> The SWPPP shall be modified whenever there is a change in the design, construction, <br /> operation, or maintenance at the construction site that has, or could have, a significant effect <br /> on the discharge of pollutants to waters of the state. <br /> The SWPPP shall be modified if, during inspections or investigations conducted by the <br /> owner/operator, or the applicable local or state regulatory authority, it is determined that the <br /> SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater <br /> discharges from the site. The SWPPP shall be modified as necessary to include additional <br /> or modified BMPs designed to correct problems identified. Revisions to the SWPPP shall <br /> be completed within seven days following inspection. <br /> 4. SOURCE CONTROL <br /> This project proposes to construct a new SFR and driveway. Volume IV of the 2014 DOE <br /> Stormwater Management Manual was reviewed for specific BMPs required for this type of <br /> land-use. None of the activities or land uses contained in any of the chapters in Volume IV <br /> applies to this project. Therefore, no site/development specific source control BMPs are <br /> required for this project. <br /> 5. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br /> By not grading or compacting the pervious and amended surfaces to remain after <br /> construction in the area of disturbance a maximum amount of site runoff from the developed <br /> project will be absorbed and infiltrated into the existing on-site soils. This will mimic the <br /> existing conditions by maintaining the existing direction and condition of flow from this site. <br /> Ocean Ave SFR 17-0802 <br /> Revised: October 2017 Page 8 <br />