Laserfiche WebLink
3/7/2019 Page <br /> City of Everett <br /> 11:03:23AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C 1709-004 Site Address 5034 OCEAN AVE <br /> Applied 9/14/2017 Applicant BUSTARD CUSTOM CONSTRUCTION INC Lot <br /> Approved 1/26/2018 Owner BUSTARD CUSTOM CONSTRUCTION INC Block <br /> Issued 1/29/2018 Contractor BUSTARD CUSTOM CONSTRUCTION INC Tract <br /> Parent Permit No. Description NEW SFR DETACHED <br /> Notes SPRINKLERS REQ'D.LANDSCAPE INSP REQ'D.CONTACT KEMBRA LANDRY 425-257-7155. <br /> Scheduled Completed Tvne Inspector Result Remarks Inspector's Comments <br /> 2/6/2018 2/6/2018 BLDG RDA CORRECTION See notes City is requiring 3rd party geotech report <br /> 02-FOOTING/SETB for footings. <br /> 2/13/2018 2/13/2018 BLDG KMK CORRECTION S3/2 detail calls for 12'max on wall height <br /> 02-FOOTING/SETB with 28"footing it appears you will exceed <br /> this height <br /> Note:received geo soils report <br /> 2/23/2018 2/23/2018 BLDG KMK APPROVAL Received <br /> 03-FOUNDATION engineering <br /> 2/23/2018 2/23/2018 BLDG 04-UFER KMK APPROVAL Received <br /> GROUND engineering <br /> 3/16/2018 3/16/2018 BLDG DWF APPROVAL As noted Verify with arch/eng Sheet S3 Typical <br /> 05-UNDERFLOOR section floor sets on foundation wall vs. <br /> hangers installed. <br /> 4/3/2018 4/3/2018 BLDG DWF CORRECTION SW-2 Install LTP4 as per plans. <br /> 07-EXTERIOR <br /> 4/10/2018 4/10/2018 GAS 01-ROUGH IN SDP CORRECTION Fresh concrete in garage-no access for <br /> inspection. <br /> 4/10/2018 4/10/2018 MECH 04-ROUGH SDP CORRECTION Heat ducts cannot displace the required <br /> IN insulation in the floor/ceiling between the <br /> garage and house. <br /> No inspection performed. <br /> 4/10/2018 4/10/2018 PLUMB SDP APPROVAL <br /> 03-ROUGH IN <br /> 4/11/2018 4/11/2018 BLDG DWF APPROVAL <br /> 07-EXTERIOR <br /> 4/24/2018 4/24/2018 PLUMB SDP CORRECTION Toilets are not yet tied into the fire system. <br /> 03-ROUGH IN Please recall inspection,plumbing,to verify <br /> completion of job. <br /> 4/24/2018 4/24/2018 GAS 01-ROUGH IN SDP APPROVAL <br /> 4/24/2018 4/24/2018 MECH 04-ROUGH SDP APPROVAL See notes See notes on 4/10/18-consult with the <br /> IN building inspector concerning ducts in <br /> floor/ceiling of garage. <br /> Combustion air/exhaust shall be per <br /> manufacturer specs. <br /> 4/24/2018 4/24/2018 BLDG DWF PARTIAL APPR Subject to receiving height survey before <br /> 08-FRAMING cover.ASPI <br /> 4/24/2018 4/24/2018 MECH SDP APPROVAL <br /> 03-REFRIGERATIO <br /> 4/26/2018 4/26/2018 BLDG DWF APPROVAL OK to cover as noted Received height survey-OK <br /> 11-INSULATION Post temp site address per R319.1. <br /> Provide insulation certificate and blower <br /> door test results at final <br /> 5/3/2018 5/3/2018 BLDG KMK APPROVAL <br /> 09-DRYWALL <br /> 9/7/2018 9/7/2018 PLANNING FINAL TFW APPROVAL <br /> 1/17/2019 1/17/2019 ADMIN USE AKH APPROVAL <br /> ONLY** <br /> 1/17/2019 1/17/2019 BLDG 14-FINAL DWF APPROVAL Message left 1/15 425-876-6551 <br /> 3:34pm 360-659-3845 <br /> 1/17/2019 1/17/2019 GAS 03-FINAL DXW APPROVAL Message left 1/15 425-876-6551 <br /> 3:34pm 360-659-3845 <br /> INSP12 <br /> C'RW Y nnM <br />