Laserfiche WebLink
Building Height Handout- a 4,, <br /> (iv= o3 1 \erc , _,%' <br /> Height Survey <br /> (For Surveyor Use Only IF a survey is required.Instructions:Complete this form prior to the framing inspection.This <br /> form will need to be provided to the City inspector at the framing inspection.Contact the Planning Department at <br /> 425.257.8731 if the structure does not meet the height limit.) <br /> Date of Survey: ` "2-\ - 1(o PERMIT# C__\ .s205 -oo 9 <br /> Property Location.Surveyed: S5-2-\ OCEI\ Po>E £ve.c-e, , v\/ `A82,---)3 <br /> (address and/or parcel#) twr, ,,ts.•e..A• 0...) Cc..se -1-.) cw),-'i- c pc-oc,errt\/ ,.,o,�C <br /> Description of Bench Mark: v.a"c'x of OcE.{+trot Av-C t- S(9'4'^ Sltr-uet <br /> Bench Mark Elevation: A Ss' ^^-- \O J., o O <br /> Fill in the information from the approved Base Elevation Survey for Box 1 or 2 and complete Box 3) <br /> A= tc)3,—?'5 BOX 1 <br /> SOX 2 <br /> B= 103..07 <br /> C= tca3,42_ Highest point of the sidewalk <br /> D= ‘03.?).?) <br /> EL <br /> A+B+C+D= zit-3.'33 /4= 'o3 38 Average Base Elev. <br /> *Submit a map showing the <br /> +Maximum Height of 2v (feet) location of the highest point of <br /> \2a\ .38 Maximum Elevation Allowed the sidewalk. <br /> BOX3 <br /> • Actual Elevation*: 1�J\,-3 \ (elev.) Height of Structure*: 27 ,93 (feet) <br /> *Measure from the average base elevation to the roof peak or from the sidewalk to top of roof. <br /> Check: <br /> I, AARs.).--) 'CI' Ty S o.) ,certify that I measured the height of the structure from <br /> thea approved average base elevation/❑ highest point of sidewalk to the top of the <br /> ridge/roof.The structured ets the height limit/❑doesn't meet the height limit. <br /> ignature of Surveyor ,f,,,,,,/,-.f.,t<,rte...,.. ,.,,,, <br /> • <br /> Ili <br /> Company E i1 <br /> Address ;-i' c ,6 <br /> .. �. <br /> FN .� � . V 'moi <br /> y '� 53114 <br /> Phone/Email O•4 <br /> r , p <br /> AL : <br /> t ,� <br />