Laserfiche WebLink
I <br /> 6. The plans appear to show new kitchen cabinets, vanity in V2 bathroom and new cabinets <br /> in the laundry room, All fixtures in the kitchen, laundry and 1/2 bathroom shall be <br /> included on the fixture count on the permit application. <br /> 7; Provide tempered safety glass in hazardous locations as defined in section R3O8 IRC. <br /> Show on plans. <br /> 8. Specify on plans which option from Table 406.2 WSEC you are using for the required <br /> 1,/4 Energy Credits (1.5 credits required) for the addition. Do not simply reference the option <br /> M'r's chosen, the requirements of the option shall be on the plans. <br /> 9. Specify on the plans how you$re meeting the requirements of section M1507.3 IRC for5 . <br /> �r <br /> e r j "Whole House Ventilation stem". Include the code section on the drawings for the <br /> 1,/14/ option chosen. <br /> ;h17-64"5 - 10-. Provide all four elevations drawn at minimum 1/4" = 1'=0"scale. Include finish material <br /> and roof pitch on elevations. Elevation drawings shall accurately represent the structure <br /> as it will appear when competed. <br /> 11.All'drawings in the construction plan set submitted shall be the same size and numbered <br /> sequentially. <br /> 12.The site plan does not include all of the required information as specified on the <br /> Residential Submittal Checklist. Provide new site plan drawn no smaller than 1" = 20'-0" <br /> on a drawing sheet no larger than 11"x 17". Please refer to the City of Everett <br /> residential Submittal Checklist located on our web site at; <br /> https//everettwa.gov/DocumentCenter/Home/View/117 <br /> A°(, 13. Provide section drawing at.garage/deck. Show all components including guard height, <br /> guard attachment and constructions joist size and spacing, sheathing and finish material. <br /> Show how roof deck will be drained. <br /> 14 Provide lateral analysis prepared by a licensed WA State structural engineer for'any/all <br /> braced wall lines that do not meet the prescriptive requirement for lateral bracing per, <br /> section R602.10 IRC..Allbraced wall panels required by section R602.10 IRC shall be <br /> dearly marked on the"plans. <br /> 15, Provide smoke alarms on each story and in basements as required per section R314 IRC, <br /> Show on plans. <br /> lam" I s Z 16. Provide Carbon monoxide alarms on each story and in basements as required per.. <br /> section R315 IRC, Show on plans. <br /> est 4faete 17. Specify size species and grade of all new headers. Provide gravity calculations for <br /> headers in existing walls supporting addition. <br /> S:\1Common\Clerical\7Heilman\C1605-009(5521 OCEAN AVE).doc <br />