Laserfiche WebLink
INSPECTION REPORT <br /> /%/-.-. ..-4 Date 9 Al Permit: t 100 5a,9 <br /> Contractor: 2-001 07/ <br /> Owner: / AJ Il�(/L� ; <br /> Site Address: 5 / �t1� ( <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid j2.6 rywall Nailing ❑Plumbing Final <br /> ['Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final / ❑(HHWT Final <br /> OTHER OR CONSULTATION: 4 5 7j(L� ' '76 <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> //❑ K FOR T.C.O. ❑ CORRECTION REQUESTED ElElOK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 1&1414 *.' ine) 14 & 4-- ilft/i., <br /> d <br /> ______ <br /> ..... _ .. <br /> Inspector: Date: 4. e2) <br /> EIR(10/06) DA BAR,INC. <br />