My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2212 PINE ST 2019-06-11
>
Address Records
>
PINE ST
>
2212
>
2212 PINE ST 2019-06-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 10:37:17 AM
Creation date
6/11/2019 10:37:06 AM
Metadata
Fields
Template:
Address Document
Street Name
PINE ST
Street Number
2212
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICS74°- <br /> ORKS PERMIT —bate Applied: 11/15/2017 <br /> City of Everett Public Works Department Public Works Permit#: PW1711-012 <br /> 3200 Cedar Street Parent Permit#: C1609-003 <br /> Everett,WA 98201 Planning Reference#: <br /> (425) 257-8810 Public Works Fee: $115 <br /> 14 DEC 2011 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> BANWAIT GURMAIL & KAUR BALBIR IMAD BAHAH <br /> 2212 PINE ST 21620 84TH AVE STE.200 <br /> EVERETT, WA, 98201-2557 KENT, WA, 98032 <br /> PHONE: PHONE: 2534687696 <br /> TAX PARCEL ID#: 00578700100500 SITE ADDRESS: 2212 PINE ST <br /> DESCRIPTION: SFR ADDITION AND REMODEL <br /> 2 STORIES + UNF BASEMENT <br /> SMYTH LAND CO S 1ST ADD BLK 001 D-00 - LOTS 5 &6 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department dated 11/16/2017. <br /> Approved plans must remain on job-site at all times. <br /> 5. Contact the City of Everett Public Works Inspector.Randy Allen at 425-339-7403 prior to starting construction for a <br /> consultation, to evaluate Erosion/Sedimentation control set-up, and with all other inspection requests. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and approved SWPP/Plan. Remove upon <br /> completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever <br /> requires use of the right-of-way for municipal purposes. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be managed <br /> on-site in a manner that does not adversely affect neighboring properties <br /> 11. Stormwater from new impervious surfaces shall not be discharged, through downspouts or other direct pipe <br /> connections, into a combined sewer. <br /> Public Works Permit Fee Breakdown: <br /> Erosion control Plans(Other) $50.00 <br /> Misc. Minor Permits And/Or Plan Reviews) $25.00 DEC <br /> PW Plan Review $20.00 / 4 2017 <br /> PW Site Inspection $20.00 CITU <br /> Petaw et_OF EuerViCes 7 ,r, <br /> City ofEverett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> ru, harmless the City of Everett from any and all claims for damages,costs, <br /> .�111.11 A€4, (Z / ) (7 expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> O•ro'-d for Constructio Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date —.• . . 2 I 7 <br /> Approved as Constructed (PW Inspector) Signa` of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE <br /> �OFF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br /> CA/0Z) <br />
The URL can be used to link to this page
Your browser does not support the video tag.