Laserfiche WebLink
INSPECTION REPORT �« 'S I <br /> , f, VL q ^r 1 r f <br /> Date ( `, \ _ Permit: t$Q( \ Y-4 <br /> Contractor: t�.. c- Sl..1C—Sr"*" <br /> Owner: <br /> Site Address: 7....'2A 2 /Le_ Set— <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Se ' ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ndwork ❑Footing ❑Rough In ❑Rough In <br /> El Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final El Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> El Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: Z�3 Z_Z_\ -_ <br /> 0 AP'ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> p • FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ►• 111OK FOR C.O. ❑ VIOLATION <br /> • UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> CYC ...,,,,,fze...\ (,)1 / <br /> 'g. <br /> Inspector:_ ,,i _____ Date: gpo <br /> I i <br /> EIR(10/06) DATABAR,INC. <br />