My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9610 19TH AVE SE VERIZON WIRELESS ANTENNA 2019-07-18
>
Address Records
>
19TH AVE SE
>
9610
>
VERIZON WIRELESS ANTENNA
>
9610 19TH AVE SE VERIZON WIRELESS ANTENNA 2019-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2019 2:59:03 PM
Creation date
6/11/2019 12:07:39 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9610
Tenant Name
VERIZON WIRELESS ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A„sy' ETT <br /> (425)257-8810 <br /> Plan Check No.: B1709-010 <br /> Application Date: 9/8/2017 <br /> , I Tenant: [TenName] <br /> 1— <br /> ,-1,—ICO <br /> :' Owner: PREMIER STORAGE EVERETT LLC <br /> cry•.a'�'r.•.i <br /> w Job Address: 9610 19TH AVE SE <br /> i--i b:Fk ,c1 a37• <br /> hi Proposed Use: <br /> CO <br /> r.�.I epi <br /> Description of Work: REMOVE& REPLACE CELL TOWER <br /> T.w EQUIPMENT <br /> r^r••. <br /> l- Plan Check Fee Paid: $172.41 <br /> L':� C�J •t:.0 <br /> C-0 e building permit application for the above-referenced project is being conditionally accepted for filing <br /> 1-:{14 pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application, it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> - <br /> Signature Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.