Laserfiche WebLink
CONTRACTOR NOTES: METAL NOTES: <br /> THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO SET FORTH IN THE CONSTRUCTION AND PART 1-GENERAL <br /> ION <br /> CONTRACT DOCUMENTS THE COMPLETE SCOPE OF WORK.CONTRACTORS BIDDING THE JOB ARE <br /> NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DRAWINGS AND OR 1. SECTION INCLUDES: <br /> SPECIFICATIONS SHALL NOT EXCUSE SAID CONTRACTOR FROM COMPLETING THE PROJECT AND STRUCTURAL STEEL FRAMING MEMBERS,BASE PLATES,PLATES,BARS AND O <br /> IMPROVEMENTS IN ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS.THE BIDDER SHALL BEAR THE GROUTING UNDER BASE PLATES. <br /> RESPONSIBILITY OF NOTIFYING(IN WRITING)THE ARCHITECT/ENGINEER OF ANY CONFLICTS,ERRORS,OR 2. SUBMITTALS: <br /> OMISSIONS PRIOR TO THE SUBMISSION OF CONTRACTOR'S PROPOSAL.IN THE EVENT OF DISCREPANCIES SHOP DRAWINGS:INDICATE SIZES,SPACING,AND LOCATIONS OF STRUCTURAL <br /> THE CONTRACTOR SHALL PRICE THE MORE COSTLY OR EXTENSIVE WORK,UNLESS DIRECTED MEMBERS,OPENINGS,CONNECTIONS,CAMBERS,LOADS,AND WELDED SECTIONS. N <br /> OTHERWISE. <br /> 3. QUALITY ASSURANCE <br /> A. FABRICATE STRUCTURAL STEEL MEMBERS IN ACCORDANCE WITH AISC MU <br /> GENERAL NOTES: SPECIFICATIONS FOR THE DESIGN,FABRICATION AND ERECTION OF <br /> DRAWINGS ARE NOT TO BE SCALED,WRITTEN DIMENSIONS TAKE PRECEDENCE,AND THIS SET OF PLANS STRUCTURAL STEEL FOR BUILDINGS. <br /> IS INTENDED TO BE USED FOR DIAGRAMMATIC PURPOSES ONLY,UNLESS NOTED OTHERWISE.THE B. PERFORM DESIGN UNDER DIRECT SUPERVISION OF A PROFESSIONAL <br /> PimI. <br /> GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING ALL MATERIALS,EQUIPMENT, STRUCTURAL ENGINEER LICENSED IN THE STATE. <br /> LABOR,AND ANYTHING ELSE DEEMED NECESSARY TO COMPLETE INSTALLATIONS AS DESCRIBED PART 2-PRODUCTS <br /> HEREIN. <br /> 1. MATERIALS: <br /> PRIOR TO THE SUBMISSION OF BIDS,THE CONTRACTORS INVOLVED SHALL VISIT THE JOB SITE AND A. STRUCTURAL STEEL MEMBERS: ASTM A572,GRADE 5011011. <br /> FAMILIARIZE THEMSELVES WITH ALL CONDITIONS AFFECTING THE NEW PROJECT,WITH THE <br /> CONSTRUCTION AND CONTRACT DOCUMENTS,FIELD CONDITIONS AND CONFIRM THAT THE PROJECT MAY B. STRUCTURAL TUBING: ASTM A500,GRADE B <br /> BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH CONSTRUCTION.ANY ERRORS,OMISSIONS, C. PIPE: ASTM A53,TYPE E OR S,GRADE B ��-q� <br /> OR DISCREPANCIES ARE TO BE BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER IN WRITING. D. BOLTS,NUTS,AND WASHERS: ASTM A325 � i. <br /> E. ANCHOR BOLTS:AEASTM 1.1, ��)GE I L <br /> THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED WITH F. WELDING MATERIALS: AWS D1.1,TYPE REQUIRED FOR <br /> CONSTRUCTION PRIOR TO STARTING WORK ON ANY ITEM NOT CLEARLY DEFINED BY THE CONSTRUCTION MATERIALS BEING WELDED <br /> DRAWINGS/CONTRACT DOCUMENTS. profttslortmt ssrvICts. <br /> G. GROUT: NON-SHRINK TYPE,PREMIXED COMPOUND <br /> THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT DESCRIBED HEREIN.THE CONTRACTOR CONSISTING OF NONMETALLIC AGGREGATE, <br /> SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS,METHODS,TECHNIQUES,SEQUENCES CEMENT,WATER REDUCING AND PLASTICIZING <br /> AND PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK UNDER THE CONTRACT. ADDITIVES,CAPABLE OF DEVELOPING <br /> A MINIMUM COMPRESSIVE STRENGTH <br /> THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS ACCORDING TO MANUFACTURER'S! OF 7000 psi AT 28 DAYS. - NE _WAV..g <br /> VENDOR'S SPECIFICATIONS UNLESS NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE H. SHOP AND TOUCH-UP PRIMER: SSPC 15,TYPE 1,RED OXIDE RCHITECTUREE <br /> PRECEDENCE. <br /> I. TOUCH-UP PRIMER <br /> FOR GALV.SURFACES: ZINC RICH TYPE <br /> ALL WORK PERFORMED ON PROJECT AND MATERIALS INSTALLED SHALL BE IN STRICT ACCORDANCE WITH <br /> ALL APPLICABLE CODES,REGULATIONS,AND ORDINANCES.CONTRACTOR SHALL GIVE ALL NOTICES AND 2. FABRICATION: 1133 184TH STREET SW <br /> COMPLY WITH ALL LAWS,ORDINANCES,RULES,REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC SUITE 202 <br /> AUTHORITY,MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS,AND LOCAL AND STATE JURISDICTIONAL CONTINUOUSLY SEAL JOINTED MEMBERS BY CONTINUOUS WELDS.GRIND EXPOSED LYNNWOOD,WA 98087 <br /> CODES BEARING ON THE PERFORMANCE OF THE WORK. WELDS SMOOTH. OFFICE:(425)778-3800 <br /> 3. FINISH: JAY@NEWWAVEARCH.COM <br /> THE STRUCTURAL COMPONENTS OF THIS PROJECT SITE/FACILITY ARE NOT TO BE ALTERED BY THIS <br /> CONSTRUCTION PROJECT UNLESS NOTED OTHERWISE. A. PREPARE STRUCTURAL COMPONENT SURFACES IN ACCORDANCE WITH SSPC <br /> SP-1 TO SP-10 PROCEDURES. <br /> DATE. 9-8-17 <br /> ANTENNA SUPPORTING POLE IS UNDER A SEPARATE CONTRACT.THE CONTRACTOR SHALL ASSIST B. STRUCTURAL STEEL MEMBERS SHALL BE HOT DIPPED GALVANIZED. <br /> ANTENNA INSTALLATION SUB-CONTRACTOR IN TERMS OF COORDINATION AND SITE ACCESS.ERECTION PREPARED BY. YML <br /> SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF PERSONNEL AND PROPERTY FROM PART 3-EXECUTION <br /> HAZARDOUS EXPOSURE TO OVERHEAD DANGERS. <br /> 1. EXAMINATION AND PREPARATION: APPROVED BY. JYS <br /> GENERAL CONTRACTOR SHALL PROVIDE AT THE PROJECT SITE A FULL SET OF CONSTRUCTION VERIFY THAT THE FIELD CONDITIONS ARE ACCEPTABLE. <br /> DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND ADDENDA OR CLARIFICATIONS FOR THE USE BY 2. ERECTION: SUBMITTALS <br /> ALL PERSONNEL INVOLVED WITH THE PROJECT, <br /> A. ALLOW FOR ERECTION LOADS. PROVIDE TEMPORARY BRACING TO MAINTAIN NO DATE DESCRIPTION <br /> DETAILS INCLUDED HEREIN ARE INTENDED TO SHOW END RESULT OF DESIGN. MINOR MODIFICATIONS FRAMING IN ALIGNMENT UNTIL COMPLETION OF ERECTION AND INSTALLATION <br /> MAY BE REQUIRED TO SUIT JOB CONDITIONS OR SITUATIONS,AND SUCH MODIFICATIONS SHALL BE OF PERMANENT BRIDGING AND BRACING. <br /> INCLUDED AS PART OF THE SCOPE OF WORK <br /> 8. FIELD WELD COMPONENTS INDICATED ON SHOP DRAWINGS. <br /> THE CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING IMPROVEMENTS, - C. DO NOT FIELD CUT OR ALTER STRUCTURAL MEMBERS WITHOUT APPROVAL <br /> EASEMENTS,PAVING,CURBING,ETC.DURING CONSTRUCTION UPON COMPLETION OF WORK OF THE ARCHITECT/ENGINEER. <br /> CONTRACTOR SHALL REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION ON OR D. AFTER ERECTION,TOUCH-UP WELDS,ABRASIONS,AND SURFACES NOT SHOP <br /> ABOUT THE PROPERTY. <br /> PRIMED OR GALV.WITH TOUCH-UP PRIMERS AS SPECIFIED UNDER SECT. <br /> CONTRACTOR SHALL ENSURE THE GENERAL WORK AREA IS KEPT CLEAN AND HAZARD FREE DURING 05000,-METALS,PART 2-PRODUCTS,H&I.SURFACES TO BE IN CONTACT <br /> CONSTRUCTION AND DISPOSE OF ALL DIRT,DEBRIS,RUBBISH AND REMOVE EQUIPMENT NOT SPECIFIED WITH CONCRETE NOT INCLUDED. 9.8.17 FINAL PERMIT <br /> AS REMAINING ON THE PROPERTY,PREMISES SHALL BE LEFT IN CLEAN CONDITION AND FREE FROM 3. FIELD QUALITY CONTROL: 8-15-17 PRELIMINARY PERMIT <br /> PAINT SPOTS,DUST,OR SMUDGES OF ANY NATURE. FIELD INSPECTION OF MEMBERS,CONNECTIONS,WELDS AND TORQUING. <br /> THE CONTRACTOR SHALL COMPLY WITH ALL LOCAL AND NATIONAL CODES,REGULATIONS AND SAFETY <br /> REGULATIONS,ALL OSHA REGULATIONS,ALL PUBLIC AND MUNICIPAL AUTHORITIES,AND ANY UTILITYRE�I$TERED <br /> COMPANIES'REGULATIONS AND DIRECTIVES. ARCHITECT <br /> THE DRAWINGS AND SPECIFICATIONS ARE A GENERAL DIRECTIVE FOR THE SCOPE OF WORK EXACT I 9-8-17 <br /> DIMENSIONS AND LOCATIONS MAY CHANGE IN THE FIELD.THE CONTRACTOR IS TO VERIFY THE <br /> DIMENSIONS AND LOCATIONS AND REPORT ANY AND ALL DISCREPANCIES TO REPRESENTATIVE.ANY T1 we. <br /> . <br /> MINOR ERRORS AND OMISSIONS IN THE DRAWINGS AND SPECIFICATIONS DOES NOT EXCUSE THE OF W Iv' ,TON <br /> CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN ACCORDANCE WITH THE INTENT <br /> OF THESE DOCUMENTS. <br /> CONTRACTOR IS RESPONSIBLE FOR FIELD MEASUREMENTS TO CONFIRM LENGTHS OF CABLE TRAYS AND <br /> ELECTRICAL LINES AND ANTENNA MOUNTING. SITE <br /> VERIFICATION THAT EXISTING TOWER/POLE/STRUCTURE CAN SUPPORT THE PROPOSED ANTENNA,COAX <br /> &ADDITIONAL EQUIPMENT LOADING IS TO BE DONE BY OTHERS. <br /> SEA-HWY 526 <br /> (MOD.SITE) <br /> 9810 19TH AVE SE <br /> EVERETT,WA 98208 <br /> SHEET TITLE <br /> GENERAL NOTES <br /> SHEET NUMBER <br /> GENERALNOTES <br /> 1 /7/L)---1/° SP-1 <br />