Laserfiche WebLink
INSPECTION REPORT <br /> Aft/ _ Date I Q Permit: 0510—05°1 <br /> R , I 1 - Contractor: T _ID G <br /> Owner: Silver L aJLe. Deni-E/A H..,„(f„ <br /> Site Address: 10510 11 ' SE A `' <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ZElectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas PipeFinall ❑HWT Final <br /> OTHER OR CONSULTATION: .S—G/:{37—cam_X APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS 'ER <br /> Ark <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ► <br /> ❑ OK FOR C.O. ❑ VIOLATION OA <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> OfQ__ _ ci'--,ter-C___— <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />