My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2015 BLDG 40-58 Plans 2022-11-09 (6)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2015 BLDG 40-58 Plans 2022-11-09 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:34:50 AM
Creation date
6/14/2019 8:35:24 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1503-046
Year
2015
Notes
EQUIPMENT FOUNDATION SPAR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05 INDEX OF DRAWINGS - MECHANICAL-- CONT. 05 INDEX OF DRAWINGS - MECHANICAL--CONT. 05 INDEX OF DRAWINGS - MECHANICAL-- CONT. 05 INDEX OF DRAWINGS - MECHANICAL--CONT. <br /> SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE <br /> M310-359 -CONTROL SYSTEMS DIAGRAMS M922 PLUMBING ISOMETRIC DIAGRAMS -TUNNEL LEVEL 01/26/15 <br /> M311 CHILLED WATER FLOW AND CONTROL DIAGRAM 03/03/15 M923 PLUM�IIVG VACUUM ISOiV1ETRIC DlAGRAVI 03/25/15 <br /> M312 HEATING HOT WATER FLOW AND CONTROL DIAGRAM 03/03/15 M930 AUTOCLAVE 1 SOUTHEAST ISOMETRIC 04/07/15 <br /> M313 STEAM & CONDENSATE FLOW AND CONTROL DIAGRAM 12/19/14 M931 AUTOCLAVE 1 SOUTHWEST ISOMETRIC 04/07/15 <br /> M314 BOILER CONTROLS 01/26/15 M932 COOLING TOWER PUMPS SOUTHWEST ISOMETRIC 04/07/15 . <br /> M315 BUILDING AIRFLOW DIAGRAM 12/05/14 <br /> M316 BUILDING AIRFLOW DIAGRAM 12/05/14 <br /> M317 CCA 100% OADACU CONTROLS 12/05/14 <br /> M318 ACU -CCA CONTROLS 03/03/15 <br /> M319 CCA RFU AND POST CURE ACU CONTROLS 01/26/15 <br /> M320 OFFICE VAV ACU CONTROL 12/05/14 <br /> M321 CONTROLS 12/19/14 <br /> M322 HVAC CONTROL SYSTEM ARCHITECTURE 03/03/03 <br /> M323 TUNNEL VENTILATION DIAGRAM 03/03/15 <br /> M310-M359 - P&ID <br /> M330a P & ID - INTERCONNECT 04/07/15 <br /> M330b P & ID -COOLING WATER PROCESS FLOW DIAGRAM 04/07/15 ' <br /> M330c AUTOCLAVE POINT OF CONNECTION TABLE 04/07/15 <br /> M331a P & ID - GN2 SUPPLY INLET 04/07/15 <br /> M331 b P & ID- GN2 PRESSURE OUTLETS 04/07/15 <br /> M332a P & ID - COOLING TOWERS 04/07/15 <br /> M332b P & ID-COOLING TOWERS II 04/07/15 <br /> M332c P& ID - COOLING WATER HEAT EXCHANGERS 04/07/15 <br /> M332d P & ID - COOLING WATER COLD WELL WEST 04/07/15 <br /> M332e P & ID- COOLING WATER COLD WELL EAST 04/07/15 <br /> M332f P & ID-COOLING WATER HOT WELL WEST 04/07/15 <br /> M332g P & ID-COOLWG WATER HOT WELL EAST 04/07/15 <br /> M332h P & ID-VALVE VAULTS 04/07/15 <br /> M332i P & ID-COOLING WATER SUPPLY/RETURN 04/07/15 � <br /> M332j P & ID -COLLECTION PIPE WEST 04/07/15 <br /> M332k P & ID - COLLECTION PIPE EAST 04/07/15 <br /> M333a P & ID -AUTOCLAVE PROCESS VACUUM 04/07/15 <br /> M334a P & ID-COMPRESSED AIR 04/07/15 <br /> M335a P & ID- NATURAL GAS 04/07/15 <br /> M336a WATER TREATMENT 04/07/15 <br /> M336b P & ID - PROCESS WATER 04/07/15 <br /> M337 AUTOCLAVE COOLING SYSTEM SEQUENCE OF OPERATIONS 04/07/15 <br /> M450-M469 - ENLARGED PLANS <br /> M450 ENLARGED BOILER ROOM 12/19/14 <br /> M451 ENLARGED PLANS 12/05/14 <br /> M460 ENLARGED PLUMBING PLANS - M1M4 01/26/15 � <br /> M461 ENLARGED PLUMBING PLANS - M1M4 01/26/15 <br /> M462 ENLARGED PLUMBING PLANS- LEVEL 1 01/26/15 <br /> M463 ENLARGED PLUMBING PLANS- LEVEL 1 01/26/15 <br /> M464 ENLARGED PLUMBING PLANS- LEVEL 1 01/26/15 <br /> M465 ENLARGED PLUMBING PLANS- LEVEL 1 01/26/15 <br /> M470 ENLARGED PLUMBING PLANS- LEVEL 2 03/09/15 <br /> M471 ENLARGED PLUMBING PLANS- LEVEL 2 03/09/15 <br /> M472 ENLARGED PLUMBING PLANS- LEVEL 3 03/09/15 <br /> M473 ENLARGED PLUMBING PLANS - LEVEL 3 03/09/15 <br /> M474 ENLARGED PLUMBING PLANS - LEVEL 2 03/09/15 <br /> M475 ENLARGED PLUBMING PLANS - LEVEL 2 03/09/15 . <br /> M500-SECTIONS & DETAILS <br /> M500 HVAC DETAILS 03/03/15 <br /> M501 HVAC DETAILS 12/05/14 <br /> M502 HVAC DETAILS 12/19/14 <br /> M503 MECHANICAL SECTIONS 12/05/14 <br /> M504 MECHANICAL SECTIONS 12/05/14 <br /> M505 MECHANICAL SECTIONS 12/05/14 <br /> M506 HVAC DETAILS 03/03/15 <br /> M507 HVAC DETAILS 12/05/14 <br /> M508 HVAC DETAILS 12/05/14 <br /> M509 MECHANICAL SECTIONS 12/05/14 <br /> M510 MECHANICAL SECTIONS 03/03/15 ' <br /> M511 MECHANICAL SECTIONS 12/05/14 <br /> M512 HVAC DETAILS 12/05/14 <br /> M513 HVAC DETAILS 12/05/14 <br /> M500 SECTIONS & DETAILS <br /> M520 PLUMBING DETAILS 03/03/15 <br /> M521 PLUMBING DETAILS 03/03/15 <br /> M522 PLUMBING DETAILS 01/26/15 <br /> M523 F'LUMBING DETAILS 03/25/15 <br /> M530 AUTOCLAVE SECTIONS 04/07/15 <br /> M531 AUTOCLAVE SECTIONS 04/07/15 <br /> M532 AUTOCLAVE TRENCH SECTIONS 04/07/15 <br /> M533 AUTOCLAVE TRENCH SECTIONS 04/07/15 <br /> M534 AUTOCLAVE SECTIONS 04/07/15 <br /> M535 AUTOCLAVE LARGE RETURN DRAIN PIPE 04/07/15 <br /> M536 AUTOCLAVE DETAILS 04/07/15 <br /> M537 AUTOCLAVE EXHAUST STACK DETAILS 04/07/15 <br /> M538 AUTOCLAVE SECTIONS 04/07/15 <br /> M539 AUTOCLAVE SECTIONS 04/07/15 <br /> M540 AUTOCLAVE SECTIONS 04/07/15 <br /> M541 AUTOCLAVE SECTIONS 04/07/15 <br /> M542 AUTOCLAVE DETAILS 04/07/15 <br /> M543 AUTOCLAVE DETAILS 04/07/15 <br /> M500-M599 SECTIONS & DETAILS <br /> M580 FIRE PROTECTION DETAILS 01/26/15 <br /> M581 FIRE PROTECTION DETAILS 01/26/15 <br /> M582 FIRE PROTECTION DETAILS 10/09/14 <br /> M583 FIRE PROTECTION DETAILS 01/26/15 <br /> M584 FIRE PROTECTION DETAILS 10/09/14 <br /> M585 FIRE PROTECTION DETAILS 10/09/14 <br /> M586 FIRE PROTECTION DETAILS 10/09/14 <br /> M900 SCHEMATIC DIAGRAMS <br /> M910 PLUMBING ISOMETRIC DIAGRAMS 12/05/14 <br /> M911 PLUMBIRIG COMPRESSEp AIR iSOMETRIC DIAGRAM 03/25/15 <br /> M912 PLUMBING INDUSTRIAL WASTE ISOMETRIC DIAGRAM 03/03/15 <br /> M913 PLUMBWG DOMESTIC WATER ISOMETRIC DIAGRAM 12/05/14 • <br /> M914 PLUMBING SANITARY ISOMETRIC DIAGRAM 12/05/14 <br /> M915 PLUMBING PROCESS WATER ISOMETRIC DIAGRAM 03/03/15 <br /> M916 PLUMBING STORM ISOMETRIC DIAGRAM 01/26/15 <br /> M917 PLUMBING ISOMETRIC DIAGRAMS - LEVEL 1 01/26/15 <br /> M918 PLUMBING ISOMETRIC DIAGRAMS - LEVEL 1 01/26/15 <br /> M919 PLUMBING NATURAL GAS ISOMETRIC DIAGRAM 03/03/15 <br /> M920 PLUMBING ISOMETRIC DIAGRAMS -TUNNEL LEVEL 01/26/15 <br /> M921 PLUMBWG ISOMETRIC DIAGRAMS -TUNNEL LEVEL 01/26/15 900 SW 16th Street Suit� 3Q7 <br /> Renton, Washin�tc�n 98U57 <br /> � <br /> � <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE � ' <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE was ACCEPTABILITY `�`� <br /> � oF H,� JXM 03/25/15 SHEET INDEX W2548317 � ���25��� � <br /> � �r THIS DESIGN AND/OR CHECKED � <br /> 0 ISSUE FOR CONSTRUCTION JXM GRK 10/09114 5 REVISION-RELEASE 11 JXM GRK 03/03/15 �� o GRK 03/25/15 SHEET 'n <br /> 5 � SPECIFICATION IS APPROVED -- -- - �n <br /> 1 REVISION-RELEASE 2 JXM GRK 12/05/14 6 REVISION-RELEASE 12 60 TI JXM GRK 03/09/15 � BRPHARCHITECTS ENGINEER TITLE BOEING 777X CWC BUILDING o <br /> � p � ENGINEERSINC. APPROVED BY DEPT. DATE GRK 03/25/15 N <br /> � No.313� CHECKED �� m <br /> 2 REVISION-RELEASE 3 JXM GRK 12119/14 7 REVISION-RELEASE 14 (ZONE 6 SPAR LAM- IFC FDN's & UTILITY SoG) JXM GRK 03/25/15 B U I L D I N G 40—�V N <br /> 3 REVISION-RELEASE 5 JXM GRK 01/26/15 mP;F �o APPROVED JOB NO. COMP NO. � <br /> 4 REVISION-RELEASE 6 JXM GRK 02/09/15 /c9rF OF AUjN��\�� APPROVED ow�No. 40-58-G6 � <br /> ARCHITECTURAL MASTER EVERETT, WA 40-58-G6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.