My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09 (2)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:29:26 AM
Creation date
6/14/2019 8:56:02 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
M1709-078
Year
2017
Notes
INSTALL DUCTWORK ASSOCIATED WITH PACV 3 AND 4 ALONG W EF 51 AND 52
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE <br /> G E�1 ERA� STR U CTU RA� M EC HA�I I CA� M EC HA�I CA� co n ' t . <br /> 40-058—GO COVER SHEET 08.08.17 40-058—S2 FOR REFERENCE ONLY — Design Criteria 10.09.14 40-058—M1ca Process Flow Diagram — PACU-4, EF-52 09.06.16 40-058—M552-1.10 HVAC Details 01.10.17 <br /> 40-058—G2r-1 SHEET INDEX (PHP-2) 08.08.17 40-058—S2g Phase II — General Notes 08.08.17 40-058—Mlda Process Flow Diagram — PACU-3, EF-51 09.06.16 40-058—M552-1.10a HVAC Details 11.01.16 <br /> 40-058—S2h Phase II — Generai Notes 08,08.17 40-058—M1 ea Phase II — Process & Domestic Water Flow Dia ram <br /> g 08.08.17 40-058—M552-3.1 Pfumbing Details 01.10.17 <br /> 40-058—S2j Phase tl — Statement of Special Inspections 08.08.17 40-058—M1fa Phase II — Compressed Air Flow Diagram 08.08.17 40-058—M587a Phase II — Fire Protection Details 08.08.17 <br /> � 40-058—S2k Phase II — Statement of Special Inspections 08.08.17 40-058—M 1 h Controls Sequence of Operation <br /> 09.06.16 40-058—M588 FOR REFERENCE ONLY — Fire Protection Details 02.21.17 <br /> 40-058—S21 Phase II — Statement of Special inspections 08.08.17 <br /> 40-058—M1h.1 Controls Sequence of Operation 08.01.17 <br /> 40-058—S212e FOR REFERENCE ONLY — Partial Grid 4 Elevation 05.17.16 <br /> 40-058—S439b FOR REFERENCE ONLY — Autociave Pi e Su orts 40-058—M1ha Controls Sequence of Operation 09.06.16 <br /> ARCHITECTURA� p Pp °3.°$.�6 <br /> 40-058—S502-1 R Phase II — REMOVAL — Enlarged Tooling Plan 08.08.17 40-058—M1 i Controls Points List 07.12.16 <br /> 40-058—A513 Phase II — P2P — Details 08.08.17 40-058—S502-2R Phase II - REMOVAL - Enlarged Tooling Plan 08.08.17 40-058—M1 ia Controis Points List 09,06,16 <br /> 40-058—A600—Oa2 Phase II — P2P Code Analysis — Plenum Level 08.08.17 40-058—S502-3R Phase II — REMOVAL — Eniarged Tooling Plan 08.08.17 40-058—M1 ka HVAC Air Flow Diagram — MAU-06, EF-55 01.10.17 <br /> 40-058—A600—Ob2 Phase II — P2P Code Analysis — Paint Booth Level �$•�$•�7 40-058—S502-4R Phase II — REMOVAL — Enlarged Tooling Plan 08.08.17 40-058—M11a HVAC Air Flow Diagram — ACU-28, VAV-5, VAV-6 01.10.17 <br /> 40-058—A600—Oc2 Phase II — P2P Code Analysis — Control Room Level 08.08.17 40-058—S5Q2 FOR REFERENCE ONLY — Enlarged Tooling Plan �2,01,�g 40-058—M1 oa Vacuum Flow Diagram — SE-2, EX-2 05.17.16 <br /> 40-058—A600—Od Phase II — P2P Code Analysis — Equipment Piatform Level 08•�8.17 40-058—S502a FOR REFERENCE ONLY — Enlarged Tooling Plan 04.19.16 40-058—M1pa HHW & CHW Water Flow Diagram — ACU-28, MAU-04, MAU-05, MAU-06 04.05.16 <br /> 40-058—A600—Oe2 Phase II - P2P Code Analysis — Paint Booth Control Areas 08.08.17 40-058—S502b Phase II — Enlarged Tooling Plan 08.08.17 40-058—M1qa Industrial Waste Diagram — IWP-16-26, 35, 36, 27-34 08.08.17 <br /> 40-058—A600-1b Phase II — P2P Paint Operations — Plenum Level Booths 2 08.08.17 40-058—S502-1 FOR REFERENCE ONLY — Enlarged Tooling Pian 12.20.16 40-058-M1ra Trap Primer Flow Diagram 08,08.17 <br /> 40-058—A600-2b Phase II — P2P Paint Operation — First Floor 08.08.17 40-058—S502-1a Phase II - Enlarged Tooling Plan 08.08.17 40-058—M2pa Phase II — Fire Protection Note Sheet 08,08.17 ' <br /> 40-058—A600-2d Phase fl - P2P Paint Operations — First Floor 08•�8�1 40-058—S502-1b FOR REFERENCE ONLY — Enlarged Tooling Plan 08.23.16 <br /> 40-058—M2r FOR REFERENCE ONLY — Fire Protection Site Plan 12.05.14 <br /> 40-058—A600-3b Phase II — P2P Paint Operations — House Mechanical Levei 08.08.17 40-058—S502-1c FOR REFERENCE ONLY — Eniarged Tooling Plan 05.17.16 <br /> 40-058—A600-4b Phase II — P2P Paint Operations — Control Room 08.08.17 40-058—M2va HVAC Equipment Schedules 01,10.17 <br /> 40-058—S502-1d Phase ►I — Enlarged Tooling Plan 08.08.17 40-058—M2wa PlumbingProcess Equipment Schedules 08.08,17 <br /> 40-058—A600-5b Phase II — P2P Paint Operations — Equipment Level 08.08.17 <br /> 40-058—S502-2 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058-M2xa Process Equipment Schedule 08.08.17 <br /> 40-058—A600-6 Phase II — P2P Paint Operations — Furniture/Equipment Plans 08.08.17 <br /> 40-058—S502-2a Phase II — Enlarged Tooling Plan 08.08.17 40-058—TNM260-59a Phase II — Partial Fire Protection Pian 08.08.17 <br /> 40-058—A600-7a Phase II — P2P Paint Operations — Mixing Room Equipment Plan 08.08.17 <br /> 40-058—S502-3 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058-1 M260-49 FOR REFERENCE ONLY — Partial Fire Protection Plan 04.04.17 <br /> 40-058—A600-10 Phase Ii — P2P Paint Operations — Ext 800th Elevations 08.08.17 <br /> 40-058—S502-3a Enlarged Tooling Plan 12.20.16 40-058-1 M260-54 FOR REFERENCE ONLY — Partial Fire Protection Plan 05.31.16 <br /> 40-058—A600-11 Phase II — P2P Paint Operations — Elevations 08.08.17 <br /> 40-058—S502-4 FOR REFERENCE ONLY — Enlarged Tooling Pian 08.08.17 40-058-1 M260-59a Phase il — Partiai Fire Protection Plan 08.08.17 <br /> 40-058—A600-13 Phase II — P2P Paint Operations — Int Booth Elevations 08.08.17 <br /> 40-058—S502-4a Enlarged Tooling Plan 12.20.16 40-058—M1M260-59a Phase II — Partiai Fire Protection Plan 08,08.17 <br /> 40-058—A600-14 Phase II — P2P Paint Operations — Int Booth Elevations 08.08.17 <br /> 40-058—A600-22 Phase II — P2P Paint Operations — Sections p$a$ �� 40-058—S502-5 Braced Frames 07.12.16 40-058-2M260-59a Phase II — Partial Fire Protection Plan 08,08.17 <br /> 40-058—A600-25 Phase II — P2P Paint Operations — Sections 08 08 �� 40-058—S502-5a FOR REFERENCE ONLY — Braced Frames 08.23.16 40-058-3M260-59a Phase II — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-26 Phase Il — P2P Paint Operations — Sections 08.08.17 40-058—S502-5c Phase II — Braced Frames 08.08.17 40-058—M481-59.05a Enlarged HVAC Ductwork Pian 04.05.16 <br /> 40-058—A600-30 Phase II — P2P Ceiling Plan 08.08.17 40-058—S502-5e Braced Frames 09.20.16 40-058—M481-59.15a Enlarged HVAC Ductwork Plan 03.08.16 <br /> 40-058—A600-40 Phase II - P2P Paint Operations — Door Schedule 08.08.17 40-058—S502-5f Braced Frames 11.15.16 40-058—M481-59.20a Enlarged HVAC Ductwork Plan 07.26.16 <br /> 40-058—A600-61 Phase II — P2P Paint Operations — Eniarged Stair Plans 08.08.17 40-058—S502-5g Phase II — Braced Frames 08.08.17 40-058—M481-59.35a Enlarged HVAC Ductwork Plan 01.05.17 <br /> 40-058—A600-63 Phase II — P2P Paint Operations — Stair Sections 08.08.17 40-058—S502-9 Phase II — Tooling Details 08.08.17 40-058—M481-59.45a Enlarged HVAC Ductwork Plan 07.12.16 <br /> � 40-058—A600-71 Phase ii — P2P Paint Operations — Details 08.08.17 <br /> 40-058—S502-12 Phase II — Tooling Details 08.08.17 40-058—M481-59.55a Enlarged HVAC Ductwork Plan 08.08.17 <br /> 40-058—A600-72 Phase II — P2P Paint Operations — Details 08.08.17 <br /> 40-058—S502-13 Phase II — Tooling Details 08.08.17 40-058—M482-59.20a Enlarged HVAC Piping Plan 11.01.16 <br /> 40-058—A600-73 Phase Il — P2P Paint Operations — Details 08.08.17 <br /> 40-058—A600-74 Phase II — P2P Paint Operations — Details 08.08.17 <br /> 40-058—S502-14 Phase II — Tooling Detaiis pg,p8,17 40-058—M482-59.45a Enlarged HVAC Piping Plan 11.01.16 <br /> 40-058—A600-75 Phase II — P2P Paint Operations — Details 08.08.17 40-058—S502-15 Tooling Details 09.20.16 40-058—M483-59.05a Enlarged Plumbing Plan 08.08.17 <br /> 40-058—S502-16 Tooling Details 10.04.16 40-058—M483-59.15a Enlarged Plumbing Plan 08.08.17 <br /> 40-058—S502-17 Tooling Details 11.01.16 40-058—M483-59.20a Enlarged Plumbing Plan 08.08.17 <br /> . 40-058—S502-18 Phase II — Tooling Details 08.08.17 40-058—M483-59.35 Eniarged Plumbing Plan 09.20.16 . <br /> 40-058—S502-19 Phase II — Tooling Details 08.08.17 40-058—M483-59.45o Enlarged Plumbing Plan 07,26.16 <br /> 40-058—S502-20 Tooling Details 08.23.16 40-058—M483-59.55a Enlarged Plumbing Plan 08,08.17 <br /> 40-058—S502-21 Phase II — Tooling Details 08.08.17 40-058—M484-59.15a Enlarged Process Piping Plan 08.08.17 <br /> 40-058—S502-23 Tooling Detaiis 11.15.16 �0-058—M484-59.20a Enlarged Process Piping Plan 08.08.17 <br /> 40-058—S502-24 Phase II — Tooling Details 08.08.17 40-058—M484-59.55a Enlarged Process Piping Pian 08.08.17 <br /> 40-058-S502-25 Tooling Details 11.01.16 40-058—M550-3.1a Entarged Plumbing Plans 08.08.17 <br /> 40-058—S502-26 Phase II — Tooling Details 08.08.17 40-058—M551-1.1 a HVAC Sections 11.01.16 <br /> 40-058—RFS161-34a FOR REFERENCE ONLY — North Wall Pipe Rack Eost of AutoClave 11.01.16 40-058—M551-1.2a HVAC Sections 11.01.16 . <br /> 40-058—RFS161-39 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058-M551-1.3a HVAC Sections 08.08.17 <br /> 40-058—RFS161-44 FOR REFERENCE ONLY — Partial Low Roof Framing Pian 01.15.16 40-058—M551-1.4 HVAC Sections 12,01.16 <br /> 40-058—RFS161-49 FOR REFERENCE ONLY — Partial Low Roof Framing Pian 01.15.16 40-058—M551-1.4a HVAC Sections 07.12.16 <br /> 40-058—RFS161-54 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058—M551-3.1 a Plumbing Sections 08.08.17 <br /> 40-058—RFS162-59 Phase II — P2P Exhaust Stack Support 08.08.17 40-058—M551-3.2a Plumbing Sections 08.08.17 <br /> 40-058—RFS162T-59 Phase II — Partial Roof Top Chord Framing Plan 08 a$ �� 40-058—M551-3.3a Plumbing Sections 08.08.17 <br /> 40-058—RFS163-59 Phase II — PHP Duct Support 08.08.17 40-058—M551-3.4a Plumbing Details 08.08.17 <br /> 40-058—M551-3.7 Plumbing Sections 11.15.16 ' <br /> 40-058—M551-3.8a Plumbing Sections 08.08.17 <br /> 40-058—M551-4.1 a Process System Sections 08.08.17 <br /> 40-058—M552-1.1a HVAC Detaiis 06.08.17 <br /> 40-058—M552-1.2a HVAC Details 01.10.17 <br /> 40-058—M552-1.3a HVAC Details 07.12.16 <br /> 40-058—M552-1.4a HVAC Details 12.01.16 <br /> 40-058—M552-1.5a HVAC Details 03.08.16 <br /> 40-058—M552-1.6a HVAC Details 11.01.16 � <br /> 40-058—M552-1.8a HVAC Details 10.18,16 <br /> 40-058—M552-1.9 HVAC Details 01,10.17 <br /> www.brph.com Copyright o 2017 <br /> Architects, Engineers, Constructors <br /> 19020 33rd Ave W,Suite 530 State of Washington <br /> Lynnwood,Washington,98036 Certificate of Authorization <br /> 425-921-3500 Architecture No.603235512 <br /> Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION 8Y APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY CAG 08.08.17 <br /> THIS DESIGN AND/OR CHECKED SHEET INDEX W2548317 08.08.17 ' <br /> SPECIFICATION IS APPROVED KML 08.08.17 sHE�r � <br /> N iN TITLE BOEING 777X CWC BUILDING � <br /> BOE,��� APPROVED BY DEPT. DATE KML 08.08.1� �� r_ � \ <br /> CHECKED I <br /> � <br /> APPRo�Eo B U I L D I N G 40-58 � <br /> JOB N0. COMP N0. <br /> ¢ <br /> U <br /> APPRovEo GENERAL MASTER EVERETT, INq °wc No. 40-058—G4q <br />
The URL can be used to link to this page
Your browser does not support the video tag.