My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2016 BLDG 40-58 Plans 2022-11-09 (3)
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2016 BLDG 40-58 Plans 2022-11-09 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:31:16 AM
Creation date
6/14/2019 2:31:58 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1602-025
Year
2016
Notes
OFFICE MEETING AND TRAINING ROOMS ON FIRST MEZZ AND 2ND FLOOR 1 OF 3
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I04 INDEX OF DRAWINGS-ARCHITECTURE-CONT. 04 INDEX OF DRAWINGS-ARCHITECTURE-CONT. 04 INDEX OF DRAWINGS- INTERIORS 17 INDEX OF DRAWINGS- FOOD SERVICE <br /> � SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE SHEET NO. DRAWING TITLE SHEET ISSUE DATE <br /> A500-A529- DETAILS A611-21 S2P-SECTION 11/17/15 AF10-AF59- PARTIAL FINISH FLOOR PLAN FS1A3 OVERALL FOOD SERVICE PLAN 04/21/15 <br /> A500 DETAILS 06/16/15 A611-22 S2P-SECTION 11/17/15 1AF10-12 PARTIAL FINISH FLOOR PLAN 10/20/15 FS1A370 ELEVATIONS AND DETAILS 04/21/15 <br /> A501 DETAILS 06/30/15 A611-23 SP2 -SECTION 11/17/15 1AF10-14 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A371 ELEVATIONS AND DETAILS 04/21/15 <br /> A502 DETAILS 04/21/15 A611-24 SP2-SECTION 11/17/15 1AF10-17 PARTIAL FINISH FLOOR PLAN 10/20/15 FS1A372 ELEVATIONS AND DETAILS 04/21/15 <br /> A503 DETAILS 04/21/15 A612 FLOOR PLAN -STRINGER RADfUS FILLER 01/15/16 1AF10-19 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A451 SERVERY EQUIPMENT PLAN 04/21/15 <br /> � A504 DETAILS 09/08/15 FINISH PLANS 1AF10-22 PARTIAL FINISH FLOOR PLAN 10/20/15 FS1A452 KITCHEN EQUIPMENT PLAN 04l21115 <br /> A505 DETAILS 12/05/14 TN1AF10-12 PARITAL FINISH FLOOR PLAN 01/26/16 1AF10-25 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A453 SELF-SERVE EQUIPMENT PLAN 04/21/15 <br /> A506 DETAILS OS/19/15 TN1AF10-12 PARTIAL FINtSH FLOOR PLAN 01/26/16 1AF10-27 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A454 ELECTRICAL ROUGH-INS PLAN 04/21/15 <br /> A507 DETAILS 07/28/15 W 1AF10-39 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A455 ELECTRICAL ROUGH-INS PLAN 04/21/15 <br /> A508 DETAILS 09/08/15 TN1AF10-57 PARITAL FINISH FLOOR PLAN 01/26/16 1AF10-40 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A456 ELECTRICAL ROUGH-INS PLAN 04/21/15 <br /> A509 DETAILS 10/30/14 TN1AF10-62 PARTIAL FINISH FLOOR PLAN 01/26/16 1AF10-44 PARTIAL FINISH FLOOR PLAN 01/26/16 FS1A457 PLUMBING ROUGH-INS PLAN 04/21/15 <br /> A510 DETAILS 06/16/15 1AF10-47 PARITAL FINISH FLOOR PLAN 05/19/15 FS1A458 PLUMBING ROUGH-INS PLAN 04/21/15 <br /> A511 DETAILS 06/16l15 1AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 FS1A459 PLUMBING ROUGH-INS PLAN 04/21/15 <br /> A512 DETAILS ''^"^'''� L10-L59- PARTIAL LAYOUT FLOOR PLAN FS1A460 BUILDING WORKS PLAN 04/21/15 <br /> ��,,,.,, �� <br /> A513 DETAILS 09/26/16 1L10-14 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A461 BUILDING WORKS PLAN 04/21/15 <br /> A514 DETAILS 01/26/16 1L10-19 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A462 BUILDING WORKS PLAN 04/21/15 <br /> A515 MILLWORK DETAILS 05/19/15 1L10-25 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A463 REFRIG. ROUGH-INS PLAN 04/21/15 <br /> A516 CEILING DETAILS 05/19/15 1L10-39 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A464 REFRIG. ROUGH-INS PLAN 04/21/15 <br /> A517 ROLLING HANGAR DOOR 03/03/15 1L10-40 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A500 NOTES AND DETAILS 04/21/15 <br /> A518 DETAILS 09/08/15 1L10-44 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A501 UTILITY SCHEDULE 04/21/15 <br /> A519 DETAILS 01/26/16 L10-L59-PARTIAL LAYOUT FLOOR PLAN FS1A502 UTILITY SCHEDULE 04/21/15 <br /> A520 DETAILS 01/26/16 1L10-12 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A503 REFRIGERATION ENGINEERING 04/21/15 <br /> A521 CEILING DETAILS 01/26/16 1L10-17 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A504 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A522 DETAILS 06/30/15 1L10-22 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A505 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A524 DETAILS 01/26/15 1L10-27 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A506 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A525 DETAILS 01/26/16 1L10-32 PARTIAL LAYOUT FLOOR PLAN �Cl��l�5 FS1A507 EXHAUST HOOD ENGINEERING 04/21/15 <br /> _ A526 DETAILS 1�.tn���-5, 1L10-37 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A508 EXHAUST HOOD ENGINEERING 04/21/15 <br /> i�V�� � <br /> I A600-A620-TOOLING 1L10-42 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A509 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-Oa P2P CODE ANALYSIS- PLENUM LEVEL 12/22/15 1L10-47 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A510 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-Ob P2P CODE ANALYSIS-PAINT BOOTH LEVEL 12/22/15 1L10-52 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A511 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-Oc P2P CODE ANALYSIS-CONTROL ROOM LEVEL 12/22/15 1L10-57 PARTIAL LAYOUT FLOOR PLAN 01/26/16 FS1A512 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-Od P2P-CODE ANALYSIS- EQUIPMENT PLATFORM LEVEL 12/22/15 L10-L59- PARTIAL LAYOUT FLOOR PLANS FS1A513 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-Oe P2P CODE ANALYSIS- PAINT BOOTH CONTROL AREAS 12/22/15 2L10-12 PARTIAL LAYOUT FLOOR PLAN 12/01/15 FS1A514 EXHAUST HOOD ENGINEERING 04/21/15 <br /> A600-1 P2P PAINT OPERATIONS-COMPOSITE PLENUM LEVEL 12/22/15 2L10-17 PARTIAL LAYOUT FLOOR PLAN 09/22/15 FS1A515 EXHAUST HOOD ENGINEERING 04/21/15 <br /> � A600-1a P2P PAINT OPERATIONS- PLENUM LEVEL BOOTHS 1 12/22/15 2L10-22 PARTIAL LAYOUT FLOOR PLAN 10/20/15 FS1A516 WALK-IN COOLER/FREEZER ENGINEERING 04/21/15 <br /> A600-1b P2P PAINT OPERATIONS- PLENUM LEVEL BOOTHS 2 12/22/15 2L10-27 PARTIAL LAYOUT FLOOR PLAN 10l20/15 FS1A517 WALK-IN COOLER/FREEZER ENGINEERING 04/21/15 <br /> A600-2 P2P PAINT OPERATIONS- COMPOSITE 1ST FLOOR PLAN 12/22/15 2L10-32 PARTIAL LAYOUT FLOOR PLAN 10/20/15 <br /> A600-2a PZP PAINT OPERATIONS - 1ST FLOOR PHASE 1 12/22/15 2L10-37 PARTIAL LAYOUT FLOOR PLAN �"''""�` <br /> 1 V/LV/ 1 J <br /> A600-2b P2P PAINT OPERATIONS - 1ST FLOOR PHASE 2 01/15/16 2L10-42 PARTIAL LAYOUT FLOOR PLAN 10/20/15 ' ._' <br /> A600-2c P2P- PAINT OPERATIONS- 1ST FLOOR PHASE 1 01/15/16 2L10-47 PARTIAL LAYOUT FLOOR PLAN 12/01/15 -- �L10-37 05/19i ` ; <br /> A600-3 P2P PAINT OPERATIONS- HOUSE MECH LEVEL 12/22/15 2L10-52 PARTIAL LAYOUT FLOOR PLAN 09/22/15 L10-42 Q5/191' :� <br /> A600-3a P2P PAINT OPERATIONS- HOUSE MECH LEVEL PHASE 1 12/22/15 2�10-57 PARTIAL LAYOUT FLOOR PLAN 10/20/15 ':i�F10-42 05l19/i 5 <br /> A600-3b P2P PAINT OPERATIONS- HOUSE MECH LEVEL PHASE 2 01/15/16 L10-L59- PARTIAL LAYOUT PLANS 4 = ZAF10-44 01/26/16 <br /> A600-4 P2P PAINT OPERATIONS -COMPOSITE CONTROL ROOM LEVEL 12/22/15 3L10-12 PARTIAL LAYOUT FLOOR PLAN 05/19/15 = WI1AF10-57 f��="!� � � <br /> A600-4a P2P PAINT OPERATIONS-CONTROL ROOM PHASE 1 12/22/15 3L10-17 PARITAL LAYOUT FLOOR PLAN OS/19/15 <br /> A600-4b P2P PAINT OPERATIONS-CONTROL ROOM PHASE 2 01/15/16 3L10-22 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-5 P2P PAINT OPERATIONS- COMPOSITE EQUIP. LEVEL 12/22/15 3L10-27 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-5a P2P PAINT OPERATIONS- EQUIP. LEVEL PHASE 1 12/22/15 3L10-32 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-5b P2P PAINT OPERATIONS- EQUIP. LEVEL PHASE 2 01/15/16 3L10-47 PARTIAL LAYOUT FLOOR PLAN 05/19I15 <br /> A600-6 P2P PAINT OPERATIONS- FURNITURE/ EQUIP PLANS 01/15/16 3L10-52 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-7 P2P PAINT OPERATIONS- MIXING ROOM EQUIP. PLAN 12/22/15 3L10-57 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-10 P2P- PAINT OPERATIONS- ELEVATIONS 12/22/15 L10-L59- PARTIAL LAYOUT FLOOR PLANS <br /> A600-11 P2P- PAINT OPERATIONS - ELEVATIONS 12/22/15 M1L10-12 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> A600-20 P2P- PAINT OPERATIONS-SECTIONS 12/22/15 M1 L10-17 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-21 P2P- PAINT OPERATIONS-SECTIONS 12/22/15 M1L10-22 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> A600-22 P2P- PAINT OPERATIONS-SECTIONS 12/22/15 M1L10-27 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> IA600-23 P2P- PAINT OPERATIONS -SECTIONS 12/01/15 M1L10-32 PARTIAL LAYOUT FLOOR PLAN 12/01/15 <br /> � A600-40 DOOR SCHEDULE 12/22/15 M1L10-37 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> A600-60 ENLARGED STAIR PLANS 12/22/15 M1L10-42 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> A600-61 ENLARGED STAIR PLANS 01/15/16 M1L10-47 PARTIAL LAYOUT FLOOR PLAN 01/26/16 <br /> A600-62 STAIR SECTIONS 12/22l15 M1L10-52 PARITAL LAYOUT FLOOR PLAN ''"""'""` <br /> IL/V i/ IJ <br /> A600-63 STAIR SECTIONS 01/15/16 M1L10-57 PARTIAL LAYOUT FLOOR PLAN 05/19/15 <br /> A600-70 DETAILS - P2P PAINT OPERATIONS 01/15/16 AF10-AF59- PARTIAL FIN�SH FLOOR PLANS <br /> A600-71 DETAILS - P2P PAINT OPERATIONS 12/22/15 3AF10-12 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> . A600-72 DETAILS - P2P PAINT OPERATIONS 12/22/15 3AF10-17 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A601 FLOOR PLAN-SPAR TRIM AND DRILL 12/07/15 3AF10-22 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A601-60 ENLARGED STAIR PLANS- SPAR TRIM & DRILL 11/03/15 3AF10-27 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A601-70 SECTIONS-SPAR TRIM & DRILL 11/03/15 3AF10-37 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A601-71 DETAILS- SPAR TRIM & DRILL 11/03/15 3AF10-47 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A602 FLOOR PLAN -STRINGER TRIM & DRILL 12/01/15 3AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A602-60 ENLARGED STAIR PLANS - STRINGER TRIM &DRILL 01/26/16 3AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A602-70 SECTIONS-STRINGER TRIM & DRILL 01/26/16 AF10-AF59- PARTIAL FINSIH FLOOR PLANS <br /> A602-71 DETAILS- STRINGER TRIM &DRILL 12/22/15 2AF10-12 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A603 FLOOR PLAN- PANEL TRIM &DRILL 11/03/15 2AF10-17 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A603-60 ENLARGED STAIR PLANS- PANEL TRIM & DRILL 11/03/15 2AF10-22 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A603-70 SECTIONS- PANEL TRIM & DRILL 11/03/15 2AF10-27 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A603-71 DETAIL- PANEL TRIM & DRILL 11/03/15 2AF10-32 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A604 FLOOR PLAN -SPAR NDI 01/26/16 2AF10-37 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A604-01 SPAR NDI -OPERATOR BOOTH 01/26/16 2AF10-42 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A605 FLOOR PLAN -STRINGER NDI 12/01/15 2AF10-47 PARTIAL FINISH FLOOR PLAN 01/26/16 <br /> A606 FLOOR PLAN- PANEL NDI 10/06/15 2AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A607-01 COMPOSITE FLOOR PLAN - FREEZER 12/22/15 2AF10-57 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A607-02 COMPOSITE FLOOR PLAN - FREEZER ROOF 11/03/15 AF10-AF59- PARTIAL FINISH FLOOR PLANS <br /> A607-20 FREEZER SECTIONS 12l22/15 M1AF10-12 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A607-21 LOADING DOCK ROOF ACCESS SECTIONS 11/03/15 M1AF10-17 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A607-40 DOOR SCHEDULE 12/22/15 M1AF10-22 PARTIAL FINISH FLOOR PLAN 09/22/15 <br /> A608 FLOOR PLAN -SPAR WASH 01/15/16 M1AF10-27 PARTIAL FINISH FLOOR PLAN 10/20/15 <br /> A608-60 SECTIONS- SPAR WASH 12/01/15 M1AF10-32 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A608-61 SECTIONS-SPAR WASH 12/01/15 M1AF10-37 PARTIAL FIN15H FLOOR PLAN 05/19/15 <br /> A609 FLOOR PLAN - STRINGER WASH 01/26/16 M1AF10-42 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A609-60 SECTIONS- STRINGER WASH 12/22/15 M1AF10-47 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A609-61 SECTIONS- STRINGER WASH 12/01/15 M1AF10-52 PARTIAL FINISH FLOOR PLAN 05/19/15 <br /> A609-70 DETAILS-STRINGER WASH 12/01/15 <br /> A610 FLOOR PLAN - PANEL NDI/PANEL WASH 01/26/16 <br /> A610-01 PANEL NDI/PANEL WASH -OPERATOR BOOTH 01/26/16 <br /> A610-60 SECTIONS - PANEL NDI/PANEL WASH 01/26/16 <br /> A610-61 SECTIONS- PANEL WASH 01/26/16 <br /> � A611-01 S2P SPAR OPERATIONS- PLENUM LEVEL 11/17/15 <br /> A611-02 S2P SPAR OPERATIONS - 1ST FLOOR PLAN 11/17/15 <br /> A611-03 S2P SPAR OPERATIONS-CONTROL ROOM LEVEL 11/17/15 <br /> A611-04 S2P SPAR OPERATIONS - EQUIP. PLATFORM LEVEL 11/17/15 <br /> A611-20 S2P- SECTION 11/17/15 <br /> 900 SW 16th Street Suite 307 <br /> Renton, Washin�ton 98057 <br /> � <br /> a <br /> DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE N <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE oF w A S ACCEPTABILITY KEB 01/26116 W2548317 01/26/16 � <br /> y�N SHEET INDEX <br /> �`` �r THIS DESI�N AND/OR CHECKED � <br /> 5 P i SPECIFICATION IS APPROVED GRK 01126116 SHEET � <br /> BOE,��� BRPHARCHITECTS ENGINEER TITLE BOEING 777X CWC BUILDING N <br /> ENGINEERSINC. APPROVEDBY DEPT. DATE GRK 01126116 � <br /> N0.3137 CHECKED a N <br /> n BUILDING 44-58 � <br /> ��'� o APPROVED JOB NO. COMP NO. <br /> '� �� 40-58-G2a Y <br /> `cqrE OF AUSN��\�P APPROVED ARCHITECTURAL MASTER EVERETT,WA °WG"0 40-58-G2a <br />
The URL can be used to link to this page
Your browser does not support the video tag.