<br /> SCOPE OF WORK: GENERAL NOTES: DESIGN CRITERIA;
<br /> THE SCOPE OF WORK FOR THE INSTALLING CONTRACTOR SHALI.INCLUDE THE FOLLOWWG: 1. DO NOT SCALE PLANS FOR THE PURPOSE OF ESTABLISHING DIMENSIONS. 1. DESIGN AND INSTALLATION SHALL BE IN ACCORDANCE WITH 2O13 NFPA 13,"STANDARD FOR THE INSTALLATION
<br /> 1, THE LAYOUT, WSTALLATION AND TESTING OF THE NEW FIRE PROTECTION AUTOMATIC WET-PIPE SPRWKLER SYSTEMS 2. NOT ALL PIPING, VALVES AND APPURTENANCES ARE SHOWN ON THE PLANS. IT IS THE RESPONSiQILITY OF THE OF SPRINKLER SYSTEMS",2015 INTERNATIONAL BUILDING CODE WITH STATE OF WASHINGTON AMENDMENTS,
<br /> AND EXPANSION THROUGHOUT THE NEW PAINT BOOTH ADDITION CONNECTED TO THE EXISTING BUILDING FIRE CONTRACTOR TO PROVIDE DETAIL, DESIGN AND INSTALLATION DOCUMENTS.REFER TO PLANS, NOTES AND 2015 INTERNATIONAL FIRE CODE, FM GLOBAL STANDARDS, BOEING FIRE PROTECTION, LOCAL ORDINANCES AND '�
<br /> PROTECTION SYSTEMS. DETAILS,AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. AUTHORIT HA I UR DI
<br /> 3. WATER FLOW SWITCH AND SUPERVISORY SWITCH CONNECTIONS SHALL BE ACCOMPLISHED BETWEEN THE 2. AL CONTROL VALVES, FLOW SWITCHES,TAMPER SWITCHES,WATER FLOW SWITCHES,AND ANY ADDITIONAL
<br /> THE EXISTING EQUIPMENT SHOWN ON THE PLANS ARE BASED UPON WESTERN STATES FIRE PROTECTION C0.AS-BUILT DIFFERENT RESPONSIBLE TRADES. E�ECTRICAL WIRING CONNECTIONS TO ELECTRICAL FIRE PROTECTION ALARM INITIATION DEVICES ON THE FIRE PROTECTION SYSTEM SHALL BE ELECTRICALLY SUPERVISED BY THE °
<br /> DOCUMENTS DATED 07/17/17. INSTALLING CONTRACTOR SHALL FIELp VERIFY THE LOCATION OF ALL EXISTWG EQUIPMENT. DEVICES SHALL BE UNDER THE ELECTRICAL/FIRE ALARM DIVISION. BOEING FIRE ALARM SYSTEM.
<br /> 4. FIRE STOP ALL PENETRATIONS OF SMOKE/FIRE PARTITIONS, FIRE STOPPING SHALL BE OF U.L LISTED ASSEMBLY. 3. SPRINKLER SYSTEMS ON LEVELS M1,2,AND 3(UNLESS NOTED OTHERWISE ON THE PLANS)CLASSIFIED AS NFPA
<br /> CLARIFICATIONS: 5. SPRINKLER SYSTEM(S)SHALL BE DESIGNED FOR A MAXIMUM WORKING PRESSURE OF 175PSI. 13 ORDINARY HAZARD GROUP II OR FM GLOBAL HG2. A DENSITY OF.20 GPM/SQ.FT. OVER A REMOTE AREA OF
<br /> 6, PROVIDE SYSTEM(S)WITH FLUSHING CONNECTIONS. 2,500 SQ.FT.TO BE PROVIDED. MAXIMUM SPRINKLER SPACING TO BE 130 SQ.FT. FOR STANDARD SPRAY
<br />� 1. JENSEN HUGHES. IS NOT RESPONSIBLE FOR THE WATER SUPPLY OR THE EFFECT EITHER MAY HAVE ON THE FIRE 7, SPRINKLER SYSTEM(S)SHALL BE HYDROSTATiCALLY TESTED FOR TWO HOURS AT 200 PSI OR AT A PRESSURE OF SPRINKLERS,
<br /> PROTECTION SPRWKLER SYSTEMS, 50 PSI IN EXCESS OF SYSTEM WORKING PRESSURE,WHICHEVER IS GREATER. 4. HYDRAULIC CALCULATIONS SHALL INCLUDE A MINIMUM OF 10%SAFETY MARGIN AT THE CONNECTION TO THE
<br /> 2. THESE DRAWINGS HAVE BEEN PROVIDED AS A BASIS QF DESIGN. IT IS THE RESPONSIBILITY OF THE FIRE SPRINKLER 8. ALL SPRINKLER PIPE AND FITTINGS SHALL BE SO INSTALLED THAT THE SYSTEM CAN BE DRAINED, PROVIDE UNDERGROUND FIRE MAIN.
<br /> CONTRACTOR TO PREPARE FULLY COORDINATED SHOP DRAWINGS IN ACCORDANCE WITH NFPA 13"WORKING ADDITIONAL DRAINS AS NECESSARY, 5. THE NUMBER OF SPRINKLER ZONES NOT TO BE REDUCED FROM THE NUMBER SHOWN.ORIENTATION OF
<br /> DRAWINGS". 9, INSPECTORS TEST CONNECTIONS SHALL BE PROVIDED SO THAT THE WATER FLOW SWITCH CAN BE TESTED. SPRINKLER ZONES TO REMAIN AS SHOWN.
<br /> 3. FIRE SPRINKLER CONTRACTOR SHALL PROVIDE LAYOUT OF THE SPRINKLER SYSTEM TO GIVE FULL CONSIDERATION TO CONNECTIONS SHALL BE LOCATED IN AN ACCESSIBLE LOCATIQN AND DISCHARGE TO AN APPROVED LOCATION. 6, THE PAINT BOOTH SHALL BE PROTECTED AS AN EXTRA HAZARD GROUP 2 OCCUPANCY AND BE PROVIDED WITH
<br /> BLIND SPACES, PIPING, ELECTRICAL EQUIPMENT, DUCTS,AND OTHER CONSTRUCTION AND EQUIPMENT. LOCATE REFER TO DETAIL. A DENSITY OF .40 GPM/SQ.FT, OVER A REMOTE AREA OF 2,500 SQ.FT.A HOSE ALLOWANCE OF 500 GPM SHALL
<br /> SPRINKLERS IN A CONSISTENT PATTERN WITH THE CEILING AND CEILING GRID(WHERE PROVIDED),LIGHTS,AND AIR 10. ALL VALVES SHALL HAVE A PERMANENTLY AFFIXED SIGN INDICATING ITS FUNCTION SECURED TO THE VALVE BE PROVIDED.
<br /> SUPPLY DIFFUSERS. SPRINKLERS SHALL BE LOCATED IN THE CENTER OF CEILING TILE WHERE TILE IS PROVIDED, WITH SUITABLE CHAIN.
<br /> DEVICES AND EQUIPMENT FOR FIRE PROTECTION SERVECE SHALL BE FM APPROVED FOR USE IN WET PIPE SPRINKLER 11. PROVIDE A PERMANENTLY ATTACHED HYDRAULIC NAMEPLATE STATIN�THEREQUIRED DESIGN CRITERIA FOR '
<br /> SYSTEMS.ALL PARAMETERS GIVEN IN THESE DOCUMENTS SHALL BE STRICTLY CONFORMED T0,ANY 1TEMS AND EACH DESIGNED SYSTEM.
<br /> LABOR REQUIRED FOR A COMPLETE FIRE PROTECTION SYSTEM, IN ACCORDANCE WITH ALL APPLICABLE CODES, 12, PIPE HANGER MATERIAL,SPACING AND METHOD OF ATTACHMENT SHALL BE PER 13;9.1,AND MANUFACTURERS PAINT BOOTH NOTES:
<br /> STANDARDS, LOCAL AUTHORITIES AND THESE CONTRACT DOCUMENTS SHALL BE FURNISHED WITHOUT INCURRIN�ANY REQUIREMENTS.
<br /> ADDITIONAL COST TO THE OWNER.THE SPRINKLER CONTRACTOR SHALL CAREFULLY REVIEW ALL CONTRACT 13. MAINTAIN A MINIMUM OF 18"CLEARANCE BELOW SPRINKLER DEFLECTOR(S)AND ANY PERMANENT OR 1. THE PAINT BOOTH SHALL BE PROTECTED AS AN EXTRA HAZARD GROUP 2 AND PROVIDED WITH A DENSITY OF.40
<br />.� DOCUMENTS AND THE DESIGN OF OTHER TRADES BEFORE PREPARING SHOP DRAWINGS. TEMPORARY OBSTRUCTION(S)PER, GPM/SQ.FT, OVER A REMOTE AREA OF 2,500 SQ.FT.A HOSE ALLOWANCE OF 500 GPM SHALL BE PftOVIDED
<br /> 4. AFTER COMPLETION, BUT BEFORE FINAL ACCEPTANCE, FIRE SPRINKLER CONTRACTOR SHALL SUBMIT COMPLETE SET 14. AT LEAST SIX(6)SPARE SPRINKLER HEADS OF EACH TYPE,TEMPERATURE AND ORIFICE SIZE USED IN THE SYSTEM 2• SPRINKLERS INSTALLED IN THE PAINT BOOTH SHALL BE PERMITTED TO BE COVERED ONLY BY CELLOPHANE
<br /> OF AS-BUILT DRAWINGS OF EACH SYSTEM FOR RECORD PURPOSES, INCLUDING A SPECIAL WRENCH FOR EACH SPRINKLER HEAD SHALL BE KEPT IN A CABINET WHERE THE AMBIENT BAGS HAVING A THICKNESS OF 0.08 MM(0.003 IN,)OR LESS OR BY THIN PAPER BAGS. THESE COVERINGS SHALL
<br /> TEMPERATURE WILL AT NO TIME EXCEED 100°. BE REPLACED FREQUENTLY SO THAT HEAVY DEPOSITS OF RESIDUE DO NOT ACCUMULATE.
<br /> MATERIAL NOTES: 3. SPRINKLER PROTECTION SHALL BE PROVIDED FOR ALL AREAS INDICATED IN NFPA 33. THIS INCLUDES, BUT NOT
<br /> HANGER NOTES: LIMITED T0, SPRAY AREAS AND ASSOCIATED EXHAUST PLENUMS AND EXHAUST DUCTWORK,ANY PARTICULATE
<br /> 1. ONLY FM APPROVED DEVICES AND MATERIALS SHALL BE INSTALLED THROUGHOUT THE SYSTEM(PER BOEING FIRE FILTERS,ANY SOLVENT CONCENTRATOR UNITS,ANY RECIRCULATION AIR SUPPLY UNITS,AND MIXING ROOMS.
<br /> PROTECTION), 1, THE COMPONENTS OF HANGER ASSEMBLIES THAT DIRECTLY ATTACH TO THE PIPE OR TO THE BUILDING 4, EXHAUST STACK TO BE PROVIDED WITH DRY-PIPE SPRINKLER PROTECTION. DRY-PIPE PIPING TO BE PITCHED A
<br /> 2. ONLY NEW SPRINKLERS,AS NOTED, OR THEIR EQUAL,SHALL BE USED. STRUCTURE SHALL BE FM APPROVED, MINIMUM OF 1/2"PER 10 FT.(FOR BOTH MAINS AND BRANCHLINES). ALL PIPING TO BE SCHEDULE 40 GALVANIZED
<br /> 3. ALL PIPING IN SIZES 1"THROUGH 2"SHALL BE SCH.40,ASTM A-53 BLACK STEEL PIPE,ASTM A-795,AND THREADED, 2. HANGERS AND THEIR COMPONENTS SHALL BE FERROUS PER 9.1.1.5,1 UNLESS THE COMPONENTS HAVE BEEN BLACK STEEL, ALL PIPING AND FITTINGS TO BE PAINTED. ALL SPRINKLERS TO BE PROVIDED A MANUFACTURES °
<br /> UNLESS INDICATED OTHERWISE. BRANCHLINES OF A SWGLE PIPE SIZE OF 2" MAY BE GROOVED. PROVEN BY FIRE TESTS TO BE ADEQUATE FOR THE HAZARD APPLICATION,AND THAT ARE LISTED FOR THAT APPLIED CORROSION RESISTANT COATING. CONTRACTOR TO PROVIDE AUXILIARY DRAINS AS NECESSARY IN
<br /> 4. THE USE OF THREADABLE THINWALL PIPE,SUCH AS ALLIEQ"XL"OR"DYNA-THREAD", IS PROHIBITED. SERVICE PER 9.1.1,5.2. LOCATIONS REQUIRED BY NFPA 13. ALL HANGERS AND ALL THREAD ROD TO BE GALVANIZED,
<br /> 5. ALL STEEL SPRINKLER PIPE SHALL HAVE A MINIMUM CORROSIQN RESISTANCE RATIO(CRR)OF 1.0. 3. SPRINKLER PIPING SHALL BE SUBSTANTIALLY SUPPORTED FROM THE BUILDING STRUCTURE,WHICH MUST
<br /> 6. ALL PIPE IN SIZES 2-112"THROUGH 8" SHALL BE SCH,40,ASTM A-53 BLACK STEEL,AND/OR ASTM A-795 GALVANIZED,AND SUPPORT THE ADDED LOAD OF THE WATER-FILLED PIPE PLUS A MINIMUM OF 250-POUNDS APPLIED AT THE POINT
<br />� ROLL-GROOVED, UNLESS INDICATED OTHERWISE, OF HANGING PER 9.2.1.3.1.
<br /> 7, ALL THREADED PIPE AND FITTINGS SHALL HAVE THREADS CUT TO ASME B1.20.1, PIPE THREAD, GENERAL PURPOSE PER 4. SPRINKLER PIPING OR HANGERS SHALL NOT BE USED TO SUPPORT NON-SYSTEM COMPONENTS PER 9.1.1,7,
<br /> 13;6.5.1.1. 5. BRANCHLINE AND MAIN HANGER LOCATION AND MAXIMUM DISTANCES SHALL MEET 9.2,2,TABLE 9.2.2.1,AND 9.2.4.
<br /> 8, ALL GROOVED BLACK STEEL PIPE SHALL BE ROLL-GROOVED. ADDITIONALLY,THERE SHALL BE NOT LESS THAN ONE HANGER FOR EACH SECTION OF PIPE PER 9.2.3,2,1, UNLESS
<br /> 9, PIPE JOINED WITH GROOVED FITTINGS SHALL BE JOINED BY A LiSTED COMBINATION OF FITTiNGS,GASKETS,AND S�'RINKL��2S AFtE SPACED LESS THAN 6-FT APART(9.2.3.2,2).
<br /> GROOVES BY THE SAME MANUFACTURER.GROOVES SHALL BE DIMENSIONALLY COMPATIBLE WITH THE FITTINGS PER 6. WALL MOUNTED SIDEWALL SPRINKLERS SHALL BE RESTRAINED TO PREVENT MOVEMENT. . -
<br /> 13;6.5.3.2. 7. THE UNSUPPORTED LENGTH BETWEEN THE END SPRINKLER IN A PENDENT POSITION OR DROP NIPPLE AND THE
<br /> 10. GROOVED FITTINGS SHALL BE MALLEABLE IRON ASTM A-47,DUCTILE IRON ASTM A-635,OR WELDED SEGMENT CARBON LAST HANGER ON THE BRANCH LINE SHALL NOT BE GREATER TNAN 12-INCHES FOR STEEL PIPE PER 9,2.3.4.3.2.
<br /> STEEL SCHEDULE 40 ASTM A-53, FINISH TO BE FACTORY PAINTED. WHEN 12-INCHES IS EXCEEDED THE PIPE SHALL BE EXTENDED BEYOND THE END SPRINKLER AND SUPPORTED BY
<br /> 11. THREADED FITTINGS SHALL BE CAST IRON CLASS 125 OR 250 ANSI B16.4 OR MALLEABLE IRON CLASS 150 OR 300 ANSI AN ADDITIONAL HANGER PER 9.2.3,4.3.3. �
<br /> 616,3.,AND GALVANIZED WHERE NECESSARY OR REQUIRED, 8. THE HANGER CLOSEST TO THE SPRINKLER SHALL BE OF A TYPE THAT PREVENT UPWARD MOVEMENT OF THE
<br /> 12. WELDED OUTLETS SHALL BE ANSI B16.11 FORGED STEEL PER NFPA(UL LISTED)FOR WORKING PRESSURE T0175PSI. PIPE PER 9.2.3,4.3.4,,AND 9,2.3.5,2.2.
<br /> 13. GALVANIZED PIPE AND FITTWGS TO BE USED IN ALL AREAS WHERE PIPE IS INSTA�LED OUTSIDE OF THE BUILDING. 9. WHERE THE BRANCH LINE ABOVE A CEILIN�SUPPLIES SPRINKLERS IN A PENDENT POSITION BELOW THE CEILING,
<br /> 14, THE AUTOMATIC SPRINKLER RISERS SHALL BE EQUIPPED WITH AN INDICATING CONTROL VALVE WITH INTEGRAL VAI.VE THE CUMULATIVE HORIZONTAL LENGTH OF AN UNSUPPORTED ARMOVER TO A SPRINKLER OR SPRINKLER DROP
<br />� TAMPER SWITCH,A VIKING OR RELIABLE CHECK VALVE,TEST AND DRAIN, GAUGES AND WATER FLOW SWITCH, THE SHALL NOT EXCEED 12 INCHES FOR STEEL PIPE PER 9,2.3.5,2.1,
<br /> RISERS SHALL BE EQUIPPED WITH A MAIN DRAIN THAT IS RQUTED TO THE EXTERIOR OF THE BUILDING OR 10. TRAPEZE HAN�ERS SHALL BE USED WHERE NECESSARY TO MEET THE ABOVE HANGING REQUIREMENTS TO
<br /> DESIGNATED PLUMBING DRAIN, THE NIPPLE AND PIPE FOR THE 2 IN. MAIN DRAIN SHALL BE GALVANIZED PIPE, TRANSFER LOADS TO APPROPRIATE STRUCTURAL MEMBERS.TRAPEZE HANGERS SHALL COMPLY WITH NFPA 13.
<br /> SPRINKLER CONTR,4CTOR SHALL PROVIDE DETAILS OF SUCH HANGERS.
<br /> INSTALLATION NOTES: 11. TRAPEZE HANGERS SHALL COMPLY WITH FM GLOBAL AND NFPA 13.
<br /> 12. THREADED SECTIONS OF ROD SHALL NOT BE FORMED OR BENT PER 9.1.2.5,
<br /> 1. THE WELDING OF PIPE OR FITTINGS ON THE JOB SITE PREMISES IS PROHIBITED, 13. FIRE SPRINKLER CONTRACTOR SHALL VERIFY WITH GENERAL CONTRACTOR AND STRUCTURAL ENGINEER ALL
<br /> 2, ALL PIPE LENGTHS ARE SHOWN CENTER-TO-CENTER UNLESS OTHERWISE NOTED. MEANS OF CONNECTING HANGERS TO THE CONCRETE FLOORS AND ROOF STEEL.THE METHOD OF ATTACHMENT
<br /> 3. ALL SPRINKLERS SHALL BE INSTALLED ACCORDING TO THEIR LISTINGS SPACING AND OBSTRUCTION REQUIREMENTS. SHALL BE APPROVED PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND ANY INSTALLATION. .
<br /> 4. SPRINKLER DEFLECTORS SHALL BE INSTALLED PARALLEL TO ROOF/CEILING SLOPE PER 13;8.6.4.2.1, UNLESS 14, "C"CLAMPS SHALL NQT BE USED UNLESS RETAINER CLIPS ARE USED IN CONJUNCTION WITH THE"C" CLAMPS,
<br /> OTHERWISE NOTED. PIPE HANGERS AND SUPPORTS FOR GALVANIZED SPRINKLER PIPING FOR DRY SPRWKLER SYSTEMS SHALL ALSO
<br /> 5. PIPE OR FITTINGS,AND COMPONENTS, INSTALLED OUTSIDE THE BUILDING, SUCH AS DRAIN PIPE EXPOSED TO BE GALVANIZED. SPRINKLER PIPING SHALL BE SUBSTANTIALLY SUPPORTED FROM THE BUILDING STRUCTURE,
<br /> WEATHER CONDITIONS, SHALL BE GALVANIZED OR OTHER APPROVED CORROSION-RESISTIVE MATERIAL. WHICH MUST SUPPORT THE ADDED LOAD OF THE WATER FILLED PIPE PLUS A MINIMUM OF 250 POUNDS APPLIED
<br /> 6. LOCATE SPRINKLER HEADS IN A CONSISTENT PATTERN WITH CEILING GRID, LIGHTS,AND SUPPLY AND RETURN AIR AT THE POINT OF HANGING IN ACCORDANCE WITH NFPA 13, THE TYPES OF HANGERS USED AND INSTALLATION
<br />� _ DIFFUSERS. FOR SPACES WITH LAY-IN TYPE CEILINGS,LpCATED SPRINKLERS IN CENTER OF TILE. THE DESIGN SHALL METHODS EMPLOYED SHALL BE IN ACCORDANCE WITH ALL REQUIREMENTS SET FORTH IN NFPA 13(PER BOEING
<br /> GIVE FULL CONSIDERATION TO BLIND SPACES, OTHER SYSTEM P(PING,ELECTRICAL EQUIPMENT, HVAC QUCTWORK, FIRE PROTECTION).
<br /> AND ALL OTHER TYPES OF OBSTRUCTIONS WHICH COULD PREVENT THE PROPER INSTALLATION AND OPERATION OF 15. SEE STRUCTURAL PLANS FOR ADDITIONAL INFORMATION IN REGARDS TO HANGING OF PIPING FROM STRUCTURE.
<br /> _ THE SPRWKLER SYSTEM.
<br /> 7. SPRINKLERS IN AREAS WITH CEILING TILE SHALL BE INSTALLED CENTER OF TILE, CONTRACTOR:
<br /> 8. UPRIGHT SPRINKLERS INSTALLEQ DIRECTLY CONNECTEQ TO PIPING OF 3 INCHES AND GREATER SHALL BE PROVIDED
<br /> ON SPRIG-UPS, 1. THESE DOCUMENTS SHALL SERVE AS A BASIS FOR DESIGN.
<br /> 9, PROVIDE INSPECTOR'S TEST AND DRAIN CONNECTION FOR ALL,SPRINKLER SYSTEMS FOR TESTING OF WATERFLOW 2. SEE CLARIFICATION NOTES ABOVE.ADDITIONAL SPRINKLER PROTECTION SHALL BE PROVIDED BENEATH
<br /> SWITCH. OBSTRUCTIONS IN ACCORDANCE WITH NFPA 13,THIS INCLUDES, BUT IS NQT LIMITED T0,THE HVAC DUCTWORK. .
<br /> 10. ESCUTCHEONS SHALL BE PROVIDED WHERE PIPES PASS THROUGH WALLS, FLOORS,AND CEILING. SPRWKLER CONTRACTOR BASE BID PRICE SHALL INCLUDE ALL REQUIRED SPRINKLERS, INCLUDfNG THOSE NOT YET
<br /> ESCUTCHEONS IN ALL FINISHED AREAS SHALL BE CHROME PLATED AND INSTALLED AS LISTED IN THE MANUFACTURES INCORPORATED INTO THE PLAN LAYOUT DOCUMENTS.
<br /> LITERATURE(PER BOEING FIRE PROTECTION). 3. SPRINKLER CONTRACTOR SHALL VISIT JOB SITE AND BECOME FAMILIAR WITH FIELD CONDITIONS,AND TO IDENTIFY
<br /> 11. FIRE DEPARTMENT CONNECTIONS ARE NOT REQUIRED PER BOEING FIRE PROTECTIQN. ANY COORDINATION CONFLICTS,
<br /> 1 Z, CLASS 1 STANDPIPES TO BE PROVIDED WITH 21/2" FIRE HOSE VALVES WITH 21(2"X 1 1/2"REDUCER AND CAPS(PER 4. SPRINKLER CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR THE INSTALLATION AND TESTING OF FIRE
<br />� BOEING FIRE PROTECTION). SPRINKLER SYSTEM(S) INCLUDED 1N THIS WORK-SCOPE,AND ADHERE TO ALL PERMIT,LICENSE AND
<br /> GOVERNMENTALREQUIREMENTS.
<br /> SEISMIC BRACING FOR PIPING: 5, CONTRACTOR SHALL OBTAIN CURRENT FIRE PUMP TEST TO BE USED AS THE WATER SUPPLY. SPRINKLER LEGEND
<br /> 6. FIRE SPRINKLER CONTRACTOR SHALL PROVIDE TO OWNER ALL LITERATURE AND INSTRUCTIONS PROVIDED BY
<br /> 1. PROTECTION OF PIPING AGAINST DAMAGE FROM EARTHQUAKES SHALL BE PROVIDED IN ACCORDANCE WITH NFPA 13, THE MANUFACTURER DESCRIBING PROPER OPERATION AND MAINTENANCE OF ANY EQUIPMENT AND DEVICES SYMBOL MFG TYPE MODEL TEMP. SIN NOM.K-FACTOR FINISH ESCUTCHEON
<br /> 2013 EDITION AND FM DS 2-8. NOT ALL REQUIREMENTS ARE LISTED BELOW. CONTRACTOR SHALL PROVIDE ALL INSTALLED,AND A COPY OF NFPA 25,°STANDARD FOR THE INSPECTION, TESTIN�,AND MAINTENANCE OF WATER-
<br /> REQUIRED SEISMIC BRACWG MATERIAL AND INSTALLATION.ALL MEANS AND METHODS SHALL BE INpICATED ON SHOP BASED FIRE PROTECTION SYSTEMS PER 10-4. Q TYCO DRY-P-ESFR ESFR-17 165° TY7229 16,8 BRASS N/A
<br /> DRAWINGS. CALCULATIONS SHALL BE PROVIDED FOR REVIEW AND APPROVAL FOR EACH BRACING METHOD AND 7. FIRE SPRINKLER CONTRACTOR SHALL INSTALL SYSTEM PIPING AND COMPONENTS IN A WORKMANSHIP LIKE
<br /> DIFFERENT ANGLE. MANNER.CHANGES IN INSTALLATION AS A RESULT OF POOR CRAFTSMANSHIP SHALL BE AS DIRECTED BY THE 0 VIKING ECU-QR N/A 214° VK595 25.2 BRASS N/A '
<br /> 2. LISTED FLEXIBLE PIPE COUPLINGS JOINING GROOVED END PIPE SHALL BE PROVIDED AS FLEXURE JOINTS TO ALLOW ARCHITECT, ENGiNEER OR OWNER,AND SHALL BE AT NO ADDITIONAL COST TO THE OWNER.
<br /> INDIVIDUAL SECTIONS OF PIPING 21/2 IN. (64 MM)OR LARGER TO MOVE DIFFERENTIALLY WITH THE INDIVIDUAL 8, THE INSTALLING CONTRACTOR SHALL ENSURE THE SPRINKLER SYSTEM IS COORDINATED WITH ALL OTHER 0 VIKING SSU-QR MICROFAST 155° VK350 8,0 BRASS N!A
<br /> SECTIONS OF THE BUILDING T�WHICH IT IS ATTACHED IN ACCORDANCE WITH NFPA 13.(COUPLINGS THAT PERMIT LESS TRADES AND BUILDING FEATURES. SPRINKLERS SHALL BE LpCATED IN ACCORDANCE WITH THE APPLICABLE
<br /> THAN 1 DEGREE OF ANGULAR MOVEMENT AT THE GROOVED CONNECTION ARE NOT CONSIDERED TO BE FLEXIBLE SECTIONS OF NFPA 13 FOR OBSTRUCTIONS.THIS SHA�L INCLUDED OBSTRUCTIONS TO SPRINKLER DISCHARGE � VIKING SSU-QR MICROFAST 175° VK350 8,0 BRASS N/A
<br /> COUPLINGS) OBSTRUCTIONS THAT PREVENT SPRINKLER DISCHARGE FROM REACHING THE HAZARD AND OBSTRUCTIONS TO
<br />� 3. THE SYSTEM PIPING SHALL BE BRACED TO RESIST BOTH LATERAL AND LONGITUDINAL HORIZONTAL SEISMIC LOADS SPRINKLER DISCHARGE PATTERN DEVELOPMENT,CONTRACTOR SHALL LOCATE SPRINKLERS AS REQUIRED TO � VIKING SSP-QR MICROFAST 155° VK302 5.6 WHITE RECESSED
<br /> AND TO PREVENT VERTICAL MOTION RESULTING FROM SEISMIC LOADS.THE STRUCTURAL COMPONENTS TO WHICH ADHERE TO THESE REQUIREMENTS AND/OR PROVIDE ADDITIONAL SPRINKLERS AS NECESSARY TO COMPLY WITH
<br /> BRACING IS ATTACHED SHALL BE DETERMINED TO BE CAPABLE OF CARRYING THE ADDED APPLIED SEISMIC LOADS. THESE SECTIONS. � VIKING SSP-QR MICROFAST 200° VK352 8.0 BRASS STANDARD
<br /> THE STRUCTURAL COMPQNENTS TO WHICH BRACING IS ATTACHED SHALL BE DETERMINED TO BE CAPABLE OF 9. SPRINKLERS SHALL BE INSTALLED UNDER FIXED OBSTRUCTIONS OVER 4 FT, IN WIDTH. SUCH ITEMS INCLUDE, BUT
<br /> CARRYING THE ADDED APPLIED SEISMIC LOADS. NOT LIMITEQ T0, MEZZANINES,DUCTWORK,DECKS, OPEN GRATE FLOORING,AND OVERHEAD DOORS.NOT ALL e VIKING SSU-QR MICROFAST 200° VK350 8,0 BRASS N/A
<br /> 4. TOPS OF ALL RISERS SHALL BE SECURED AGAINST DRIFTING IN ANY DIRECTION, UTILIZING A FOUR-WAY SWAY BRACE. REQUIRED SPRINKLERS MAY BE SHOWN ON THESE DOCUMENTS.CONTRACTOR TO PROVIDE ALL REQUIRED
<br /> THE FOUR-WAY BRACE PROVIDED AT THE RISER CAN ALSO PROVIDE LONGITUDINAL AND LATERAL BRACING FOR SPRINKLERS AS A PART OF BASE BID. � VIKING SSP-QR MICROFAST 155° VK352 8.0 WHITE RECESSED
<br /> - ADJACENT MAINS.
<br /> 5. BRACING SHALL BE ATTACHED DIRECTLY TO FEED AND CROSS MAINS. EACH RUN OF PIPE BETWEEN CHANGES W � TYCO HSW-SR TY-B 200° TY3351 5.6 POLYESTER N/A �
<br /> DIRECTION SHALL BE PROVIDED WITH BOTH LATERAL AND LONGITUDINAL BRACING.
<br /> � TYCO SSP-SR ELO-231B 155° TY5251 11.2 BRASS N/A
<br /> � TYCO SSU-SR ELO-2316 155° TY5151 11.2 BRASS N/A
<br />�
<br /> 0 TYCO P-ESFR ESFR-17 165° TY7223 16.8 BRASS N/A
<br />�
<br /> �� 9 �. BAfi.� _
<br /> f:.
<br /> � �,�:�sti� OO�r� �.
<br /> � JENSEN HUGHES � '���Y��":�� h�'� �
<br /> � /b �
<br /> �
<br /> www.brph.com Copyright�2017 �,l
<br /> 725 Primera Blvd � Suite 215 � Lake Mary, FL 32746 Architects, Engineers, Constructors ''"� 5�7�? �1
<br /> P 407.647.3737 � F 407.647.4929 1g020 33rd Ave w,suite 5so S(a(e oi Wasning(on G Qr���,f�,Ft`� �'a'
<br /> www.jensenhughes.com , CertificateofAuthorization �'f. aV �
<br /> Lynnwood,WasBing on,98036 Archiiecture No.603235512 � 'S.S(U v r�l,t%'
<br /> Project: 1 HRB00390 425-921-3500
<br /> cngineering No.3137
<br /> �
<br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE Q
<br /> aF wa Sy ACCEPTABILITY CGB 08/08117 �
<br /> 0 ISSUEFORCONSTRUCTION c�B HRB o3�08�,6 �P� "�r THISDESIGNAND/OR CHeCKE� PHASE II - FIRE PROTECTION NOTE SHEET W2548317 � os�os��� �
<br /> - 5 � SPECIFICATION IS APPROVED
<br /> GGB OSIOHI'I 7 SHEET �
<br /> 1 REVISION-RELEASE 72(PHASE I�-PHP) CGB HRB 08/08/17 � BRPHARCHITECTS ENGINEER TITLE r.
<br /> ENGiNEERsiNC. APPROVED BY DEPT. DATE HRB OS/OHI'I7 BOEING 777X CWC BUILDING o
<br /> ��,�� No.3�3� CHECKED N
<br /> � M2 a M
<br /> �P = _ p �
<br /> B U I L D I N G 4 0 5 8 4o-58-M2 a �
<br /> � �o APPROVED JOB NO. COMP NO. m
<br /> �/c�rF �F AU1N��\�P APPROVED
<br /> P �
<br /> MECHANICAL MASTER EVERETT, WA °wc No. 40-58-M2pa