My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-58
>
Plans
>
3003 W CASINO RD 2017 BLDG 40-58 Plans 2022-11-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 10:28:04 AM
Creation date
6/17/2019 10:00:42 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-58
Permit
B1708-033
Year
2017
Notes
PAINT BOOTHS 3 AND 4
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A� <br /> t <br /> � + <br /> DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TIT�E DATE DRAWING NUMBER DRAWING TITLE DATE DRAWING NUMBER DRAWING TITLE DATE <br /> G EN E RAL STR U CTU RA� M EC HAN ! CAL Nl EC HAN I CA� c o n ' t . <br /> 40-058—GO COVER SHEET 08.08.17 40-058—S2 FOR REFERENCE ONLY — Design Criteria 10.09.14 40-058—M1ca Process Flow Diagram — PACU-4, EF-52 09.06.16 40-058—M552-1.10 HVAC Details 01.10,17 <br /> 40-058—G2r-1 SHEET INDEX (PHP-2) 08.08.17 40-058—S2g Phase II — General Notes 08.08.17 40-058—M1da Process F{ow Diagram — PACU-3, EF-51 09.06.16 40-058—M552-1.10a HVAC Details 11.01.16 <br /> 40-058—S2h Phase II — Generai Notes 08.08.17 40-058—M1ea Phase II — Process & Domestic Water Flow Diagram 08.08.17 40-058—M552-3.1 Plumbing Detai�s 01.10.17 <br /> 40-058—S2j Phase II — Statement of Special Inspections 08.08.17 40-058—M1fa Phase il — Compressed Air F{ow Diagram 08.08.17 40-058—M587a Phase II — Fire Protection Details 08.08,17 �► � <br /> 40-058—S2k Phase II — Statement of Special Inspections 08.08.17 40-058—M1 h Controls Sequence of Operation 09.06.16 40-058—M588 FOR REFERENCE ONLY — Fire Protectian Details �2.21.17 <br /> 40-058—S21 Phase II — Statement of Special Inspections 08.08.17 40-058—M1 h.1 Controls Sequence of Operation 08.01.17 <br /> 40-058—S212e FOR REFERENCE ONLY — Partial Grid 4 Elevation 05.17.16 <br /> 40-058—S439b FOR REFERENCE ONI.Y — Autoclave Pi e Su orts 40-058—Mlha Controls Sequence of Operation 09.06.16 <br /> ARC H ITECTU RA� p pP 03.08.16 <br /> 40-058-M1 i Controls Points List 07.12.16 <br /> 40-058—S502-1R Phase II — REMOVAL — Enlarged Tooling Plan 08.08,17 <br /> 40-058—A513 Phase ii — P2P — Details 08.08.17 40-058—S502-2R Phase II — REMOVAL — Enlarged Tooling Plan 08.08.17 40-058—M1ia Controls Points List 09.06,16 • <br /> 40-058—A600—Oa2 Phase II — P2P Code Analysis — Plenum Level 08.08.17 40-058—S502-3R Phase II — REMOVAL — Enlarged Tooling P(an 08.08.17 40-058—M1ka HVAC Air Flow Diagram — MAU-06, EF-55 01.10.17 <br /> 40-058—A600—Ob2 Phase II — P2P Code Analysis — Paint Booth Level 08.08.17 40-058—S502-4R Phase II — REMOVAL - Enlarged Tooling Plan 08.08.17 40-058—M11a HVAC Air Fiow Diagram — ACU-28, VAV-5, VAV-6 01.10.17 <br /> 'I 40-058—A600—Oc2 Phase II — P2P Code Analysis — Control Room Levei 08.08.17 40-058—S502 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.01.16 40-058—M1 oa Vacuum Flow Diagram — SE-2, EX-2 05.17.16 ° � <br /> - I. 40-058—A600—Od Phase il — P2P Code Analysis — Equipment Platform Level 08.08.17 40-058—S502a FOR REFERENCE ONLY — Enlqrged Tooling Plan 04.19.16 40-058—M1pa HHW & CHW Water Fiow Diagram — ACU-28, MAU-04, MAU-05, MAU-06 04.05.16 <br /> / <br /> 40-058—A600—Oe2 Phase II — P2P Code Analysis — Paint Booth Control Areas 08.08.17 40-058—S502b Phase II — Eniarged Tooling Plan 08,08.17 40-058—M1qa industrial Waste Diagram — IWP-16-26, 35, 36, 27-34 08.08.17 <br /> 40-058—A600-1b Phase II — P2P Paint Operations — Plenum Level Booths 2 08.08.17 40-058—S502-1 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058—M1ra Trap Primer Flow Diagram 08.08.17 <br /> 40-058—A600-2b Phase II — P2P Paint Operation — First Floor 08.08.17 40-058—S502-1a Phase II — Enlarged Tooling Plan 08.08.17 40-058—M2pa Phase II — Fire Protection Note Sheet 08.08.17 ' <br /> 40-058—A60Q-2d Phase II — P2P Paint Operations — First Floor 08•a8•�� 40—a58—S502-1 b FOR REFERENCE ONLY — Enlarged Tooling Pian 08.23.16 • <br /> 40-058—M2r FOR REFERENCE ONLY — Fire Protection Site Plan 12.05.14 <br /> 40-058—A600-3b Phase II — P2P Paint Operations — House Mechanical Level 08.08.17 �0—Q58—S502-1c FOR REFERENCE ONLY — Enlarged Tooling Plan 05.17.16 <br /> 40-058—M2va HVAC Equipment Schedules 01.10.17 <br /> 40-058—A600-4b Phase II — P2P Paint Operatians — Control Room 08.08.17 <br /> 40-058—S502-1d Phase II — Enlarged Tooling Pian 08.08.17 40-058—M2wa PlumbingProcess Equipment Schedules 08.08.17 <br /> 40-058—A600-5b Phase II — P2P Paint Operations — Equipment Level 08.08,17 � � <br /> 40-058—S502-2 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20,16 40-058—M2xa Process Equipment Schedule 08.08.17 <br /> 40-058—A600-6 Phase II — P2P Paint Operations — Furniture/Equipment Plans 08.08.17 <br /> 40-058—S502-2a Phase II — Enlarged Tooling Plan 08.08.17 40-058—TNM260-59a Phase II — Partial Fire Protection Plan 08.08,17 <br /> 40-058—A600-7a Phase II — P2P Paint Operations — Mixing Room Equipment Plan 08.0$.17 <br /> 40-058—S502-3 FOR REFERENCE ONLY — Enlarged Tooling Plan 12.20.16 40-058-1 M260-49 FOR REFERENCE ONLY — Partial Fire Protection Pian 04.04.17 <br /> 40-058—A600-10 Phase II — P2P Paint Operations — Ext Booth Elevations 08.08.17 <br /> 40-058—S502-3a Enlarged Tooling Plan 12.20.16 40-058-1 M260-54 FOR REFERENCE ONLY — Partial Fire Protection Plan 05.31.16 <br /> 40-058—A6Q0-11 Phase II — P2P Paint Operations — Elevations 08.08.17 <br /> 40-058—S502-4 FOR REFERENCE ONLY — Enlarged Tooling Plan 08.08.17 40-058-1 M260-59a Phase il — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-13 Phase II — P2P Paint Operations — int Booth Elevations 08.08.17 <br /> 40—a58-S502-4a Enlarged Tooling Plan 1220.16 40-058—M1M260-59a Phase II — Partial Fire Protection Plan 08.08.17 � <br /> 40-058—A600-14 Phase II — P2P Paint Operations — Int Booth Elevations 08.08.17 <br /> 40-058—A600-22 Phase il — P2P Paint Operations — Sections 08.08.17 40-058—S502-5 Braced Frames 07.12.16 40-058-2M260-59a Phase II — Partial Fire Protection Plan 08.08.17 <br /> 40-058—A600-25 Phase II — P2P Paint Operations — Sections pg �g �� 40-058—S502-5a FOR REFERENCE ONLY — Braced Frames 08.23.16 40-05$-3M260-59a Phase il — Partial Fire Protection Plan 08.08.17 <br /> : <br /> 40-058—A600-26 Phase II — P2P Paint Operations — Sections 08.08.17 40-058—S502-5c Phase II — Braced Frames 08.08.17 40-058—M481-59.05a Enlarged HVAC Ductwork Plan 04.05.16 <br /> 40-058—A600-30 Phase II — P2P Ceiling Plan 08.08.17 40-058—S502-5e Braced Frames 09.20.16 40-058—M481-59.15a Enlarged HVAC Ductwork Plan 03.08,16 <br /> 40-058—A600-40 Phase II — P2P Paint Operations — Door Schedule 08.08.17 40-058—S502-5f Braced Frames 11.15.16 40-058—M481-59.20a Enlarged HVAC Ductwork Plpn 07,26.16 <br /> 40-058—A600-61 Phase II — P2P Paint Operations — Enlarged Stair Plans 08.08.17 40-058—S502-5g Phase II — Braced Frames 08.08.17 40-058—M481-59.35a Enlarged HVAC Ductwork Plan <br /> 01.05.17 <br /> j 40-058—A600-63 Phase II = P2P Paint Operations — Stair Sections 08.08.17 40-058—S502-9 Phase il — Tooling Details 08.08.17 40-058—M481-59.45a Enlarged HVAC Ductwork Plan 07.12.16 � <br /> � 40-058—A600-71 Phase II P2P Paint Operations — Details 08.08.17 <br /> � 40-058—S502-12 Phase II — Tooling Details 08.08.17 40-058—M481-59.55a Enlarged HVAC Ductwork Plan 08.08.17 <br /> 40-058—A600-72 Phase il — P2P Paint Operations — Details 08.08.17 <br /> 40-058—S502-13 Phase II — Tooling Details 08.08.17 4Q-058—M482-59.20a Enlarged HVAC Piping Plan 11.01.16 <br /> 40-058—A600-73 Phase II — P2P Paint Operations — Details 08.08.17 <br /> 40-058—S502-14 Phase II — Tooling Details 08.08.17 40-058—M482-59.45a Enlarged HVAC Piping Plan 11.01.16 � '° <br /> 40-058—A600-74 Phase II — P2P Paint Operations — Details 08.08.17 <br /> 40-058—A600-75 Phase II — P2P Paint Operations — Details 08.08.17 40-058—S502-15 Toolinq Detaiis 09.20.16 40-058—M483-59.05a Enlarged Plumbing Plan 08.08.17 <br /> 40-058—S502-16 Tooling Details 10.04.16 40-058—M483-59.15a Enlarged Plumbing Pian 08.08.17 <br /> 40-058—S502-17 Tooling Details 11.01.16 40-058—M483-59.20a Enlarged Plumbing Plan 08.08.17 <br /> 40-058—S502-18 Phase ll — Tooling Details 08.08.17 40-058—M483-59.35 Enlarged Plumbing Plan 09.20.16 . <br /> 40-058—S502-19 Phase II — Tooling Details 08.08.17 40-058—M483-59.45a Eniarged Plumbing Plan 07.26.16 . <br /> 40-058—S502-20 Tooling Details 08.23.16 40-058—M483-59.55a Enlarged Plumbing Plan 08.08.17 <br /> 40-058—S502-21 Phase II — Tooling Details p8,08.17 40-058—M484-59.15a Enlarged Process Piping Plan 08.08.17 <br /> 40-058—S502-23 Tooling Detaiis 11.15.16 40-058—M484-59.20a Enlarged Process Piping Plan 08.08,17 9 � <br /> 40-058—S502-24 Phase II — Tooling Details 08.08.17 40-058—M484-59.55a Enlarged Process Piping Plan 08.08.17 <br /> 40-058—S502-25 Tooling Details 11.01.16 �0-058—M550-3.1a Enlarged Plumbing Plans 08.08,17 <br /> 40-058—S502-26 Phase II — Tooling Details 08.08.17 40-058—M551-1.1 a HVAC Sections 11.01.16 <br /> 40-058—RFS161-34a FOR REFERENCE ONLY — North Wall Pipe Rack East of AutoClave 11.01.16 40-058—M551-1.2a HVAC Sections 11.01.16 • <br /> 40-058—RFS161-39 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058—M551-1.3a HVAC Sections 08.08.17 • <br /> 40-058—RFS161-44 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 01.15.16 40-058—M551-1.4 HVAC Sections 12.01.16 <br /> 40-058—RFS161-49 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 01.15.16 40-058—M551-1.4a HVAC Sections 07.12,16 <br /> 40-058—RFS161-54 FOR REFERENCE ONLY — Partial Low Roof Framing Plan 03.08.16 40-058—M551-3.1 a Plumbing Sections 08.08.17 ° . <br /> 40-058—RFS162-59 Phase II — P2P Exhaust Stack Support 08.08.17 40-058—M551-3.2a Plumbing Sections 08.08.17 <br /> 40-058—RFS162T-59 Phase II — Partial Roof Top Chord Framing Plan 08.08.17 40-058—M551-3.3a Plumbing Sections 08,08.17 <br /> 40-058—RFS163-59 Phase II — PHP Duct Support 08.08.17 40-058—M551-3,4a Plumbing Details 08,08.17 <br /> ,� �: 40-058—M551-3J Plumbing Sections 11.15.16 ' <br /> � C 40-058—M551-3.8a Plumbing Sections 08.08.17 ` <br /> 40-058—M551-4.1 a Process System Sections 08.08.17 <br /> 40-058—M552—l.la HVAC Details 06.08.17 <br /> � ` <br /> 40-058—M552-1.2a HVAC Details 01.10.17 <br /> 40-058—M552-1.3a HVAC Details 07.12.16 <br /> 40-058—M552-1.4a HVAC Details 12.01.16 <br /> 40-058—M552-1.5a HVAC Details 03.08.16 <br /> 40-058—M552-1.6a HVAC Detaiis 11.01.16 <br /> 40-058—M552-1.8a HVAC Details 10.18.16 � : <br /> 40-058—M552-1.9 HVAC Details 01.10.17 <br /> www.brph.com Copyrighto2017 �,. ' <br /> Architects, Engineers, Constructors <br /> 19020 33rd Ave W,Suite 530 State of Washington ' <br /> Lynnwood,Washington,98036 Certificate of Authorization <br /> 425-921-3500 Architecture No.603235512 <br /> Engineering No.3137 <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE <br /> ACCEPTABILITY CAG 08.08.17 . <br /> THIS DESIGN AND/OR CHECKED S H E ET I N DEX W2548317 08.08.17 <br /> SPECIFICATION IS APPROVED KML 08.08.17 SHEET � .. <br /> BOE,��� APPROVED BY DEPT. DATE KMLNE 08.08.17 TITLE BOEING 777X CWC BUILDING r i <br /> CHECKED G 2 r 1 \ <br /> co <br /> APPRo�Eo B U I L D I N G 40-58 � <br /> JOB N0, COMP N0. <br /> 1 � ' � <br /> aPPRovE� GENERAL MASTER EVERETT, INq °wc No. 40-058—G4q <br />
The URL can be used to link to this page
Your browser does not support the video tag.