Laserfiche WebLink
/i/f9rt ,A. <br /> Seat&Office <br /> AYES TESTING ENGINEERS, INC <br /> C. 20225 C Valley Road <br /> St&110 <br /> Lynnwpcd.WA98036 <br /> A 16TMXIO COMPANY 01425.7429360 <br /> fax425.745.1737 <br /> March 5, 2019 <br /> Tacoma Orrice <br /> 10029 S.Tacana Way <br /> StaleE2 <br /> City of Everett Tacoma,WA 98499 <br /> ph 253.584.3i20 <br /> Building Division fax 253.584.3707 <br /> 3200 Cedar <br /> Everett, WA 98201 PordandOfice <br /> 7911 NE33rdDrive <br /> State 190 <br /> Attention: Commercial Inspection Portland,OR 97211 <br /> ph 503281.7515 <br /> fax 503.281.7579 <br /> Re: Community Transit Swift Green Line Project Final Letter <br /> Bothell to Everett NB/SB Various Stations Permit I)Jo, 1612-010—Station 3021 <br /> (If Z 5 4 irpoii Y.31612-012—Station 3020 <br /> L44.131612-013.131612-013—Station 3037 <br /> '/t' ir $1612-014—Station 3018 <br /> 673 J !t ,e�. <br /> ��p5.� �c� B1701-021 — Station 3017 <br /> B1701-022 — Station 3036 <br /> This is to inform you that registered special inspections have been completed for this project as <br /> per our reports, copies of which have been sent to you. <br /> Special inspection was provided for: <br /> • Reinforced Concrete <br /> • Base Plate Grouting <br /> To the best of our knowledge, all work inspected was either performed in accordance with, or <br /> corrected to conform to, the city approved drawings, or engineer approved changes. <br /> We trust this provides you with the information that you require. Should you have any questions <br /> please call us at (425) 742-9360. <br /> Sincerely, <br /> Mayes Testing Engineers, Inc. <br /> Michael S. Dolder, P.E. <br /> Senior Principal <br />