Laserfiche WebLink
Plan Section 2 <br /> Description of Improvements and Details <br /> 2.1 Overpass or. Underpass at Pigeon Creek No. 1 <br /> Future improvements in this area could include interpretive signs, restrooms, and <br /> additional park improvements, such as benches. Designs for the proposed public access <br /> at Meadowdale Beach Park should be evaluated for applicability to an undercrossing at <br /> Pigeon Creek. The drawing below illustrates an undercrossing of the railroad tracks to <br /> reach the beach at the end of the service road that parallels Pigeon Creek No. 1. <br /> hE�::(IL MINI, dip <br /> ✓-riv 9�nE - <br /> iTs p. V� - <br /> • <br /> a f - U <br /> ti —may J I <br /> ..rte <br /> F-- ,\ <br /> �,�•Rawer P✓-€ec f <br /> tsrnrl ,S71-7-1/: �r rm.✓.r� '+f— <br /> • <br /> 2.2 Trail Along South Pigeon Creek No. 1 to Terminal Ave., As a <br /> condition of approval of a shoreline substantial development permit for its Marine <br /> Terminal Improvements at the Port's Hewitt Terminal facility, the Port <br /> constructed a paved walkway running along the east side of the property to an upland area <br /> adjacent to Pigeon Creek No. 1 with beach access and a picnic area and viewpoint. <br /> 2.3 Terminal Avenue to Everett Avenue Connection— <br /> The 25th Street ped/bike overcrossing at W. Marine View Dr. is now complete. It connects <br /> Terminal Avenue with an overcrossing of the railroad tracks to Everett Avenue and the <br /> downtown. <br /> Shoreline Public Access Plan Update 2019 12 <br /> 19 <br />