My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/12 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/12 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 9:46:11 AM
Creation date
6/18/2019 9:45:03 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix <br /> Unit Costs (20 8) <br /> Approximate <br /> Trail Section Type Unit Cost(per linear foot) <br /> Asphalt trail, 8 feet wide $54 <br /> Asphalt trail, 12 feet wide $ 81 <br /> Sidewalk, 8 feet wide) ' $ 88 <br /> Sidewalk, 12 feet wid0 $ 135 <br /> Ground-supported elevated walk, low-level $ 675 <br /> Ground-supported elevated walk, 8 feet wide, high-level $945 <br /> Overwater elevated structure, 8 feet wide $945 <br /> Shoreline restoration, 20-foot wide strip $203 <br /> Landscaping, 12-foot wide strip* $ 101 <br /> • <br /> Terraced path with beach restoration $ 540 <br /> *Includes irrigation <br /> • <br /> • <br /> Shoreline Public Access Plan Update 2019 66 59 <br />
The URL can be used to link to this page
Your browser does not support the video tag.