My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perteet Inc 6/4/2019 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2020
>
Perteet Inc 6/4/2019 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 11:04:35 AM
Creation date
6/18/2019 11:04:30 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Perteet Inc
Approval Date
6/4/2019
Council Approval Date
5/29/2019
End Date
12/31/2020
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
Downtown Streetscape Improvements 2 & 3
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Total Compensation
$492,340.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Arlington
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Purchasing Cooperative Interlocal
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41= O rlvIl&structural <br /> examearte engineering&punning <br /> CG Engineering,PLLC Client/Billing: Perteet,Inc. <br /> 250 4'h Ave 5,Suite 200 Edmonds,WA 98020 2707 Colby Ave.,Suite 900 <br /> P-425.778.8500 F—425.778.5536 Everett,WA 98201 <br /> Website: cgengineering.com <br /> Project Name/Location: <br /> Date:March 28,2019 <br /> City of Everett Transit Shelter Construction Support Project 8: <br /> Rucker Ave Streetscape Improvements CG Contact: Joe Galusha,PE,SE <br /> Everett,WA 98201 Project Contact: <br /> Name/Phone:Gina Parenteau/425.322.0279 <br /> Email:gina.parenteau@perteet.com <br /> Scope/Intent and Extent of Services <br /> CG Engineering will provide structural engineering construction support for the Rucker Ave transit <br /> shelter. These services will include submittal review,response to substitution requests,clarification and <br /> interpretation of the drawings,periodic site visits,responses to contractor's questions&RFI's. if <br /> requested,field sketches and/or drafted drawing revision sketches will be provided as necessary based <br /> on site conditions or field changes. We have included up to 2 site visits or meeting as part of this scope of <br /> work. <br /> FEE: NTE$4,137.50 <br /> To be invoiced on a time and expense basis of the enclosed rates <br /> 2019 Schedule of Charges <br /> Personnel Charges Hourly Rate <br /> Principal $215.00 <br /> Associate Principal $190.00 <br /> Project Manager $170.00 <br /> Structural Engineer III $150.00 <br /> Structural Engineer II $130.00 <br /> Structural Engineer I $110.00 <br /> Civil Engineer Ill $150.00 <br /> Civil Engineer II $130.00 <br /> Civil Engineer I $110.00 <br /> Planner $130.00 <br /> CAD Drafter Ill $105.00 <br /> CAD Drafter II $95.00 <br /> CAD Drafter I $85.00 <br /> Clerical $80.00 <br /> Expert Witness $275.00 <br /> Reimbursable expenses for items such as plotting,reproduction,and mileage(0.58/mile),shall be invoiced at <br /> costs plus 12%. These rates ore subject to change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.