Laserfiche WebLink
MAKERS architecture and urban design <br /> Everett Downtown Streetscape <br /> Fee Proposal <br /> 4/18/2019 <br /> Hours Amount <br /> PM @ DESIGNER @ <br /> Tasks $195 $115 <br /> 1. Project Planning and Management <br /> 1.1 Coordination with City Staff 4 12 $2,160 <br /> 1.2 Monthly admin activities 8 8 $2,480 <br /> 2. Construction Admin and Support <br /> 2.1 Construction "conformed" drawing set 2 12 $1,770 <br /> 2.2 (1) Pre-construction meeting 4 4 $1,240 <br /> 2.3 (3)Three construction meetings 4 12 $2,160 <br /> 2.4 Review of shop drawings and materials 2 16 $2,230 <br /> 2.5 RFI clarifications 2 24 $3,150 <br /> 3. Design Engineering Support <br /> 3.1 Field changes and revisions 2 12 $1,770 <br /> Total $16,960 <br />