Laserfiche WebLink
PERTEET <br /> Consultant Fee Determination Summary <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 P 425.252.7700 <br /> EXHIBIT D <br /> Project:Everett Downtown Streetscape- Construction Design Support <br /> Client:City of Everett <br /> Hourly Costs <br /> Classification Hours Rate Amount <br /> Sr.Associate 216 $205.00 $44,280 <br /> Sr.Engineer/Mgr 8 $190.00 $1,520 <br /> Engineer III 265 $135.00 $35,775 <br /> Engineer III 6 $135.00 $810 <br /> Technician III 6 $105.00 $630 <br /> Const Technician III 12 $110.00 $1,320 <br /> Sr Planner/Cultural Resources Manager 4 $165.00 $660 <br /> Accountant 7 $95.00 $665 <br /> Clerical 7 $85.00 $595 <br /> Cultural Resources Specialist II 235 $110.00 $25,850 <br /> Cultural Resources Specialist II 4 $110.00 $440 <br /> Total Hourly Costs 770 $112,545.00 <br /> Reimbursables <br /> Expenses Amount <br /> Total Expenses 0 <br /> In-House Costs Qty Rate Amount <br /> Xerox Prints(Large Sheet) 140 $2.000 $280 <br /> Total In-House Costs $280.00 <br /> Subconsultants <br /> Subconsultants Cost Markup Amount <br /> CG Engineering,PLLC $4,138.00 1.00 $4,138 <br /> HWA GeoSciences Inc $2,550.00 1.00 $2,550 <br /> JGM Landscape Architects,Inc. $3,020.00 1.00 $3,020 <br /> Makers $16,960.00 1.00 $16,960 <br /> Total Subconsultant Costs $26,668.00 $26,668.00 <br /> Other <br /> Management Reserve $13,229 <br /> Total Other Costs $13,229.00 <br /> Contract Total $152,722.00 <br /> Prepared By: Regina M Parenteau Date: April 19,2019 <br />