My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Kirk Brooks <br /> From: Sabina Papa <br /> Sent: Thursday,January 05, 2017 11:06 AM <br /> To: Kirk Brooks <br /> Cc: Euneka Richards;Tim Miller; Corey Hert;John Wisdom; Michael Brick;Tom Hingson; <br /> George Baxter; Marc Bolland; Skip Algard;Vincent Bruscas <br /> Subject: RE: Community Transit Swift Station Construction Plan Review. <br /> Hi Kirk, <br /> Looking at the plan, it appears the comments I had in the pre-application meeting were addressed, and that the <br /> contractor will relocate the bus stops and amenities affected at no cost to ET.The shelter cement pads also seem to be <br /> 10'x15', consistent with our standards. <br /> Since we are operating service on this corridor,our assumption is that the stop relocations for the local service will take <br /> place before the construction of the Swift stop replacing it, but we'd like to make sure that is indeed the case. Of <br /> particular importance in that regard is the pull-out stop relocation at Airport Road, as it is used as a layover zone for our <br /> vehicles and it is essential for our daily operations. <br /> The following Everett Transit contacts should be added to the notification list for construction, as we want to ensure our <br /> employees and customers are prepared. <br /> Marc Bolland, Operations Program Manager <br /> mbolland@everettwa.gov;425-257-8911 <br /> Skip Algard,Service Planning Inspector <br /> salgard@everettwa.gov;425-257-7765 <br /> Vince Bruscas, Facilities Project Coordinator <br /> vbruscas@everettwa.gov;425-257-8989 <br /> We'll be happy to provide more direction or clarification along the way, as the construction process starts. Please let us <br /> know if you have any questions at this time. <br /> Thank you, <br /> Sabina Popa, Program Manager <br /> Service Planning II Marketing II Commute Trip Reduction II PR <br /> Everett Transit II 3201 Smith Ave., Suite 215 <br /> P: 425-257-8805 II Cell: 425-327-5924 II F: 425-257-8945 <br /> spopa@everettwa.gov <br /> www.EverettTransit.org II www.facebook.com/everett.transit <br /> 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.