Community Transit Swift II BRT-Everett Submittal Page 2/-1;). <br /> construction at some locations;modifications to existing storm drainage;utility relocations;signing and <br /> striping modifications;and traffic signal improvements or modifications at some locations. Station sites will <br /> include fifteen (15) station pairs, a single northbound station at 220th Street SE, a single station with extended <br /> platform at Canyon Park Park&Ride, and two station shelters with amenities at the proposed Seaway Transit <br /> Center. <br /> The Swift II BRT project will also include project elements to improve safety and reliability to transit service <br /> within the congested travel corridor.To provide improved transit reliability,reduced travel time, and <br /> improved safety for Swift operation,roadway improvements are proposed at three locations within the <br /> corridor: 128th Street SW/SE at I-5,northbound SR 527 at 164th Street SE,and southbound SR 527 at SR <br /> 524/208th Street SE.These roadway improvements will include roadway widening, curb and gutter, sidewalk, <br /> retaining walls, traffic signal modifications and relocations,traffic island modifications, storm drainage <br /> installation and modifications,and utility relocations. <br /> Everett Review and Coordination <br /> Community Transit has been working with all of the affected jurisdictions including Everett since spring <br /> 2015. Those efforts have included station siting review,identification and coordination of the associated <br /> roadway improvements,negotiating interagency agreements,and review of the 30%, 60%,90%,and 100% <br /> design level plans for the Corridor'Stations. A copy of our responses to the City's 100%review comments <br /> has been included in this submittal for your reference. <br /> Six (6) of the Swift BRT stations are located within the City of Everett: <br /> • Station#3021 Airport Road at SR 99 northbound; <br /> • Stations #3039 and 3020 Airport Road at 112th Street SW southbound and northbound; <br /> • Stations #3037 and 3018 Airport Road at Kasch Park Road southbound and northbound;and <br /> • Station#3036/3017 Seaway Transit Center northbound/southbound(shelter installations only). <br /> Please note that the Corridor Station plans submitted include only those plan view sheets applicable to the <br /> stations listed above that are within the City of Everett. The detail sheets include details for various stations <br /> within the project corridor and may not apply to every station. <br /> Other Reviews/Approvals <br /> • Community Transit prepared a NEPA Documented Categorical Exclusion (DCE) for this project. The <br /> Federal Transit Administration (FTA)reviewed and concurred with the NEPA documentation on March <br /> 21,2016. Electronic copies of all NEPA documents have been included in this submittal for your <br /> reference. <br /> Deferred Submittals and Permit Issuance <br /> As previously discussed, traffic control plans for the Stations are Contractor required submittals.We are <br /> requesting that the City proceed with their review of the permit submittals with the condition that these be <br /> submitted prior to right-of-way permit issuance. Once Community Transit has a Contractor under contract, <br /> expected in the next few weeks,these will be submitted for review and approval by the City. <br /> K:\project\32100\32130T\Admin\Corresp\Everett08232017L.docx <br />