Laserfiche WebLink
Portable Changeable Message Sign will be measured per each one time only for <br /> each sign used on the project. The final pay quantity shall be the maximum <br /> number of Portable Changeable Message Signs in place at any one time. <br /> *** <br /> 1-10.5 Payment <br /> Section 1-10.5 is supplemented with the following: <br /> "Uniformed Officers", per hour. <br /> "Portable Changeable Message Sign", per each. <br /> The unit Contract price for "Uniformed Officers" and "Portable Changeable Message Signs" shall <br /> be full compensation for all costs of labor, materials, and equipment incurred by the Contractor <br /> in performing the Contract Work for these items. <br /> All costs of preparation, submittal, revisions, and approval of site specific Traffic Control Plans <br /> and Detour Plans will be considered incidental to the lump sum contract payment for"Project <br /> Temporary Traffic Control". <br /> All costs of furnishing, installing, and maintaining Business Open Signage as noted in 1-07.23(1) <br /> of these Special Provisions will be considered incidental to the lump sum contract payment for <br /> "Project Temporary Traffic Control". <br /> END OF DIVISION 1 <br /> Community Transit Swift II BRT DRAFT Special Provisions SP10 <br /> November 2016 <br />