Laserfiche WebLink
r <br /> • <br /> S:\MBrick\development review\2016\11-Nov\PreAppl6-050.xlsx Printed:11/22/2016 10:55 AM <br /> Project Name Swift II Stations Traffic Reviewer MGB <br /> Project Location Various Locations within Everett City Limits Dev Reviewer KB <br /> Project Description Swift BRT Station Location for new line Planner GP <br /> Received Date 11/4/2016 Due Date 11/22/2016 Review Date 11/22/2016 File# PreAppl6-050 <br /> Area Type DCBD ❑X SW Everett ❑X Remainder <br /> TRAFFIC STUDY REQUIRED <br /> Site Access <br /> Check Sight Distance(From Table 1,attached) DAt Intersections DAt Driveways <br /> 0 Residential Development-Vertical Clearance from 30"to 60"above pavement 10'from Back of Curb <br /> Commercial Development-Vertical Clearance from 30"to 84"above pavement 15'from Back of Curb <br /> Right In/Right Out Turn Restriction at DCondition of Permit Possible in Future <br /> Access point requires traffic control device Stop Sign Yield Sign Signal Median/Island <br /> All roadways and driveways must meet City of Everett Design Standards <br /> _ <br /> Access point is public roadway, use City of Everett standard intersections <br /> _ <br /> _Access point is private roadway, use City of Everett standard driveway plans <br /> Check access point Spacing-Adjacent .Spacing-Opposite DThroat Depth Grade <br /> All access points must be paved <br /> _ <br /> Reduce potential conflict points DAccess Points OStreet Intersections ElDriveway Cut <br /> _Access point requires realignment <br /> —Access points require consolidation <br /> _Shared access with adjacent property required <br /> Provide pedestrian access to City Sidewalks DAD Building Doorways 0 <br /> — <br /> Pedestrian facilities must be separated from vehicular traffic <br /> — <br /> All traffic control markings and devices on driveways within 50 feet of ROW shall be MUTCD compliant <br /> — <br /> Site Circulation and Parking Issues <br /> —Provide project location map, including adjacent driveways, local and arterial intersections <br /> —Provide detailed site plan, including circulation and parking details <br /> Reduce potential internal circulation conflicts <br /> — <br /> Provide at least_Total Parking Spaces <br /> Provide at least Visitor Parking Space <br /> — <br /> —Provide parking analysis indicating total estimated parking demand for project <br /> —Parking layout must be consistent with City of Everett Standards <br /> —All parking areas should be paved <br /> —Pedestrian route should be between parking rows and separated from vehicle drive surface <br /> —Provide commercial vehicle turn-around space/turning radius <br /> —Provide freight vehicle turn-around space/turning radius <br /> —Is freight loading/unloading zone required <br /> Check dumpster locations with disposal company-dumpsters may NOT be located in required parking spaces <br /> — <br /> /r <br /> City of Everett Staff Use Only <br />