proposed method for depositing concrete shall have approval of the Engineer prior to concrete placement. <br /> The concrete on the top 5 feet of the shaft shall be vibrated. <br /> Casing Removal <br /> During casing removal, a minimum 5-foot head of concrete must be maintained to balance the soil and <br /> water pressure at the bottom of the casing. This casing shall be well coated with form oil prior to concrete <br /> placement. <br /> Construction Tolerances <br /> 1. The centerline of the drilled shaft shall be within 3 inches of Plan position in the horizontal plane, at the <br /> Plan elevation for the top of the shaft. <br /> 2. The vertical alignment of the shaft excavation shall not vary from the Plan alignment by more than 1/4 <br /> inch per foot of depth. <br /> 3. After all the concrete is placed, the top of the reinforcing steel cage shall be no more than 1/2 inch above <br /> and no more than 1/2 inch below the Plan position. <br /> 4. The minimum diameter of the drilled shaft shall be 1 inch less than the specified shaft diameter. <br /> 5. The top elevation of the shaft shall have a tolerance of ± 1/2 inch from the Plan top of shaft elevation. <br /> 6. Excavation equipment and methods shall be designed so that the completed shaft excavation will have a <br /> flat bottom. The cutting edges of excavation equipment shall be normal to the vertical axis of the <br /> equipment within a tolerance of ± 3/8 inch per 12 inches of diameter. <br /> Drilled shaft excavations constructed in such a manner that the concrete shaft cannot be completed within <br /> the required tolerances are unacceptable. When approved, corrections may be made to an unacceptable <br /> drilled shaft excavation by any approved combination of the following methods: <br /> 1. Overdrill the shaft excavation to a larger diameter to permit accurate 30 placement of the reinforcing steel <br /> cage with the required minimum concrete cover. <br /> 2. Increase the number and/or size of the steel reinforcement bars. <br /> The approval of the correction procedures is dependent on analysis of the effect of the degree of <br /> misalignment and improper positioning. Correction methods may be approved as design analysis indicate. <br /> Redesign drawings and computations prepared by the Contractor's Engineer shall be signed by a <br /> Professional Engineer licensed in the State of Washington. Materials and work necessary, including <br /> engineering analysis and redesign, to effect corrections for out of tolerance drilled shaft excavations shall be <br /> furnished at no cost to the Owner. <br /> Submittals <br /> 12 <br /> Swift II BRT Boeing to Canyon Park Station—Traffic Signal 90%Special Provisions—12/1/2016 <br />