Laserfiche WebLink
specific modifications to the criteria. Bidders shall submit such requests to the Contracting <br /> Agency no later than June 21st, 2017 and address the request to the Project Engineer or <br /> such other person designated by the Contracting Agency in the Bid Documents. <br /> 1-03 AWARD AND EXECUTION OF CONTRACT <br /> 1-03.3 Execution of Contract <br /> (October 1, 2005 APWA GSP) <br /> Revise this section to read: <br /> Copies of the Contract Provisions, including the unsigned Form of Contract, will be available <br /> for signature by the successful bidder on the first business day following award. The number <br /> of copies to be executed by the Contractor will be determined by the Contracting Agency. <br /> Within **5 ***calendar days after the award date, the successful bidder shall return the <br /> signed Contracting Agency-prepared contract, an insurance certification as required by <br /> Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. Before <br /> execution of the contract by the Contracting Agency, the successful bidder shall provide any <br /> pre-award information the Contracting Agency may require under Section 1-02.15. <br /> Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> Agency nor shall any work begin within the project limits or within Contracting Agency- <br /> furnished sites. The Contractor shall bear all risks for any work begun outside such areas <br /> and for any materials ordered before the contract is executed by the Contracting Agency. <br /> If the bidder experiences circumstances beyond their control that prevents return of the <br /> contract documents within the calendar days after the award date stated above, the <br /> Contracting Agency may grant up to a maximum of ***10 *** additional calendar days for <br /> return of the documents, provided the Contracting Agency deems the circumstances warrant <br /> it. <br /> (January 5, 2015 WSDOT GSP) <br /> The first paragraph of Section 1-03.3 is supplemented with the following: <br /> The Contract will not be executed until the Contractor completes sections I, Ill, and VIII of <br /> the Transfer of Coverage for the Construction Stormwater General Permit and returns the <br /> form to the Contracting Agency. <br /> 1-03.4 Contract Bond <br /> (December 2016 CT GSP) <br /> Delete the first paragraph and replace it with the following: <br /> The successful bidder shall provide executed payment and performance bonds, each for the <br /> full contract amount. <br /> Swift Green Line—Corridor Stations Special Provisions SP15 <br /> May 2017 <br />