My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
>
Address Records
>
AIRPORT RD
>
11831
>
WHOLE SITE FILE
>
11831 AIRPORT RD WHOLE SITE FILE 2020-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2020 11:19:57 AM
Creation date
6/18/2019 1:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
11831
Tenant Name
WHOLE SITE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
534
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
specific modifications to the criteria. Bidders shall submit such requests to the Contracting <br /> Agency no later than June 21st, 2017 and address the request to the Project Engineer or <br /> such other person designated by the Contracting Agency in the Bid Documents. <br /> 1-03 AWARD AND EXECUTION OF CONTRACT <br /> 1-03.3 Execution of Contract <br /> (October 1, 2005 APWA GSP) <br /> Revise this section to read: <br /> Copies of the Contract Provisions, including the unsigned Form of Contract, will be available <br /> for signature by the successful bidder on the first business day following award. The number <br /> of copies to be executed by the Contractor will be determined by the Contracting Agency. <br /> Within **5 ***calendar days after the award date, the successful bidder shall return the <br /> signed Contracting Agency-prepared contract, an insurance certification as required by <br /> Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. Before <br /> execution of the contract by the Contracting Agency, the successful bidder shall provide any <br /> pre-award information the Contracting Agency may require under Section 1-02.15. <br /> Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> Agency nor shall any work begin within the project limits or within Contracting Agency- <br /> furnished sites. The Contractor shall bear all risks for any work begun outside such areas <br /> and for any materials ordered before the contract is executed by the Contracting Agency. <br /> If the bidder experiences circumstances beyond their control that prevents return of the <br /> contract documents within the calendar days after the award date stated above, the <br /> Contracting Agency may grant up to a maximum of ***10 *** additional calendar days for <br /> return of the documents, provided the Contracting Agency deems the circumstances warrant <br /> it. <br /> (January 5, 2015 WSDOT GSP) <br /> The first paragraph of Section 1-03.3 is supplemented with the following: <br /> The Contract will not be executed until the Contractor completes sections I, Ill, and VIII of <br /> the Transfer of Coverage for the Construction Stormwater General Permit and returns the <br /> form to the Contracting Agency. <br /> 1-03.4 Contract Bond <br /> (December 2016 CT GSP) <br /> Delete the first paragraph and replace it with the following: <br /> The successful bidder shall provide executed payment and performance bonds, each for the <br /> full contract amount. <br /> Swift Green Line—Corridor Stations Special Provisions SP15 <br /> May 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.