Laserfiche WebLink
If, in the opinion of the Engineer, personnel used for installing pervious concrete are unqualified, <br /> inattentive to quality, or unsafe, they shall be removed or reassigned from installation of <br /> pervious concrete at the written request of the Engineer. <br /> 5-06.3(10)B Test Panel <br /> Production placement of pervious concrete shall not occur until the Contractor has completed a <br /> test panel of pervious concrete pavement that meets all of the acceptance criteria described <br /> herein and is accepted by the Engineer. <br /> The Contractor shall construct a test panel utilizing a minimum of seven (7) cubic yards of <br /> pervious concrete. If multiple pavement section depths are shown on the plans, a test panel <br /> shall be constructed for each pavement section depth/thickness. The width of the test panel <br /> shall have a width no smaller than the greatest width to be used during the construction and <br /> installation of the pervious concrete onsite. The test panel(s) shall include at least one joint and <br /> at the spacing specified on the plans and specifications. Test panels may be placed non- <br /> contiguously. The test panel(s) shall be equivalent and representative of the production pervious <br /> concrete pavement in all aspects including subbase, depth,joints, method of placement, curing, <br /> and preparation. Construction and evaluation of the test panel shall occur as follows: <br /> 1. Notify the Engineer at least ten (10)Working Days before installing pervious <br /> concrete test panels. <br /> 2. Coordinate the location of the test panel with the Engineer. <br /> 3. Install the test panel in accordance with the Specifications and Drawings. <br /> 4. Notify the Engineer when the test panel is ready for inspection and acceptance <br /> testing. <br /> 5. Acceptance testing will be conducted in accordance with Section 5-03.3(6). <br /> 6. Remove, replace, and dispose of any unsatisfactory portions of test panels as <br /> determined by the Engineer, at no additional cost to the Contracting Agency. <br /> Failure to install acceptable test panel(s) of pervious concrete will indicate an unapproved test <br /> panel(s) and require new test panel(s) for review. <br /> The completed and approved test panel(s) shall establish the JMF. <br /> The approved test panel shall meet the requirements of Section 5-03.3(6). <br /> Upon successful completion of the infiltration test, unless otherwise determined by the Engineer, <br /> three (3), cores will be cut in accordance with ASTM C42 and will be used to validate the mix <br /> design under the acceptance criteria of Section 5-06.3(6). Cores shall be taken at the same <br /> location where the infiltration test was conducted. The average hardened density of the cores <br /> shall be the hardened density used for the JMF. The hardened density of each core used for <br /> determining the JMF shall be within five (5) percent of the mean value of the three cores. Core <br /> holes shall be filled by the Contractor with pervious concrete meeting the proposed JMF and <br /> shall match adjacent pavement color, texture and grade. <br /> The completed and accepted test panels shall be maintained and protected throughout the <br /> duration of the Work and may not be demolished and disposed of without written permission <br /> Swift Green Line—Corridor Stations Special Provisions SP85 <br /> May 2017 <br />