Laserfiche WebLink
Catch Basin Type 2, 60 In. Diam. with Overflow Riser will be measured per each. <br /> There will be no specific measurement for the lump sum bid item "Infiltration Chamber Gallery". <br /> There will be no specific measurement for the lump sum bid item "Stormwater Detention Tank <br /> System". <br /> Connection to Existing Drainage Structure will be measured per each. <br /> Adjust Catch Basin or Manhole will be measured per each. <br /> Adjust Utility Box to Finish Grade will be measured per each. <br /> 7-05.5 Payment <br /> Section 7-05.5 is supplemented with the following: <br /> All costs associated with furnishing and installing grates/lids for inlets, catch basins and <br /> manholes shall be considered incidental to the unit bid price per structure regardless of lid/grate <br /> type. <br /> "Connection to Existing Drainage Structure", per each. <br /> The unit contract price(s) above shall be full pay for connection to existing drainage structure or <br /> existing drainage pipe, including but not be limited to: coring the existing catch basin, cutting the <br /> existing pipe, repairs needed to restore the pipe to use, and sealing the new connections. <br /> "New Solid Locking Lid", per each. <br /> The unit contract price per each for"New Solid Locking Lid" shall be full pay for all costs <br /> necessary to install the new solid locking lid. When the lid falls within the sidewalk, ramps, or <br /> crosswalk, work will include furnishing and installing a slip-resistant coating on the lid. <br /> "Adjust Catch Basin or Manhole", per each. <br /> "Adjust Utility Box to Finish Grade", per each. <br /> The unit contract price per each for"Adjust Catch Basin or Manhole" and "Adjust Utility Box to <br /> Finish Grade"shall be full pay for all costs necessary to make the adjustment including, but not <br /> limited to, meeting slip-resistant standards, rotating cover to align with curb or to accommodate <br /> new improvements as necessary, and restoration of adjacent areas in a manner acceptable to the <br /> Engineer. <br /> Adjustment of existing storm vault lids to finish grade will be measured and paid as "Adjust Catch <br /> Basin or Manhole" per each. <br /> "Wetland Treatment Catch Basin", per each. <br /> The unit contract price per each for the "Wetland Treatment Catch Basin" shall be full pay for <br /> furnishing and installing Modular Wetland Systems Linear Systems Vault(s) model MWS-L-4-4 <br /> or an approved equal, including preparation of structural submittals, pipe connections, <br /> pretreatment cartridges, treatment media, plant support media, and all incidentals necessary to <br /> complete the installation in accordance to the plan, specification, and manufacturer's <br /> recommendations. <br /> Swift Green Line—Corridor Stations Special Provisions SP100 <br /> May 2017 <br />