SR 527 at 196th Street SE <br /> Boring GEI-5 was drilled in the southbound existing bus stop lane on SR 527; hand auger HA-2 was <br /> completed in the grass behind the fence west of GEI-5 as shown on site plan Figure 2E. <br /> GEI-5 and HA-2 were completed to depths of 2% feet bgs. At GEI-5, a thin layer of fill was encountered <br /> underlying the asphalt. The fill consisted of silty sand with gravel. Underlying the fill was a thin concrete <br /> slab and a 4 inch PVC pipe. We stopped GEI-5 because of the PVC pipe encountered. We understand <br /> WSDOT has no records of this PVC pipe. Surficial soils encountered in HA-2 consisted of medium dense <br /> silty sand with gravel,which became dense to very dense at the bottom of the boring.The hand auger met <br /> practical refusal at 21/2 feet. <br /> We did not encounter groundwater at this location during drilling. <br /> SR 527 at 180th Street SE <br /> Boring GEI-6 was drilled in the parking lot in the southwest corner of the intersection of SR 527 and <br /> 180th Street SE,as shown on site plan Figure 2F. <br /> Boring GEI-6 was completed at a depth of 101/2 feet bgs. Glacial till was encountered directly beneath the <br /> thin asphalt section to the depth explored. The glacial till varied in composition, but was generally very <br /> dense silty sand with gravel and sandy silt with gravel. <br /> We did not encounter groundwater at this location during drilling. <br /> SR 527 at 164th Street SE <br /> Explorations completed in the vicinity of SR 527 and 164th Street SE include boring GEI-24 located in the <br /> right lane of northbound SR 527 south of the intersection; hand auger HA-3 located on the grass slope <br /> south of the southwest corner of the intersection; boring GEI-8 in the right turn lane from eastbound Mill <br /> Creek Road onto northbound SR 527; and boring MW-3 about 200 feet south of GEI-24.The locations of <br /> the explorations are shown on site plan Figure 2G. <br /> Boring MW-3, GEI-24, hand auger HA-3 and boring GEI-8 were completed at depths of 21%, 16/, 4, and <br /> 161/2 feet bgs, respectively. In general, medium dense gravel and sand with variable silt content was <br /> encountered below the pavement surfacing in the borings. Medium dense to dense silty sand was <br /> encountered in both borings at a depth of about 10 feet to the bottom of the borings. Hand auger HA-3 also <br /> encountered medium dense silty sand below the topsoil, which became dense at a depth of about 3 feet. <br /> Boring MW-3 encountered very stiff silt below the surficial fill at a depth of approximately 10 feet,and very <br /> dense silty sand (glacial till)at a depth of about 13 feet. <br /> Groundwater was observed at approximately 4 to 5 feet bgs in GEI-8 and HA-3 at the time of drilling. <br /> Groundwater was not observed in GEI-24, but a wet soil sample was encountered at the bottom of the <br /> boring.Groundwater was measured in MW-3 at a depth of 4 feet on March 10, 2017. <br /> GEOENGINEERS_g April 14,2017 Page 6 <br /> File No.2095-032-00 <br />