Laserfiche WebLink
in GEI-13 to the depth explored. We interpret the dense silty sand encountered the hand auger to also <br /> consist of glacial till. <br /> Boring MW-1 and test pit PIT-1 were completed in the native growth protection area (NGPA)situated west <br /> of 3rd Avenue SE along the north side of 128th Street SE. Boring MW-1 was completed to a depth of <br /> 21/feet bgs,and test pit PIT-1 was completed to a depth of about 8 feet(after completion of the infiltration <br /> test). Boring MW-1 encountered loose to dense silty sand which might be fill or weathered glacial till to a <br /> depth of about 12 feet, underlain by very dense glacial till. Test pit PIT-1 encountered about 11h feet of fill <br /> consisting of loose silty sand with gravel underlain by medium dense silty sand with gravel. Weathered <br /> glacial till consisting of medium dense silty sand with gravel and cobbles was encountered at a depth of <br /> 5 feet.The till becomes unweathered and very dense at a depth of 7 feet. <br /> We did not encounter groundwater during drilling in GEI-13 or in hand auger HA-5. Groundwater was <br /> measured in MW-1 at a depth of 6.8 feet on March 11, 2017. <br /> 128th Street SE widening at 1-5 <br /> Borings GEI-20 and GEI-21 were drilled near the northbound 1-5 on-ramp. GEI-20 was drilled on the <br /> Interurban Trail in the northeast corner of the intersection; GEI-21 was drilled on the grass embankment <br /> on the west side of the on-ramp as shown on site plan Figure 2L. <br /> Borings GEI-22 and GEI-23 were drilled near the southbound 1-5 on-ramp. GEI-22 was drilled on the grass <br /> embankment on the east side of the on-ramp and GEI-23 was drilled at the toe of the existing rockery as <br /> shown on site plan Figure 2M. <br /> Borings GEI-20,GEI-21,GEI-22 and GEI-23 were drilled to depths of 111/2 to 161 feet. Fill was encountered <br /> on the east side of 1-5 to a depth of about 141 feet below the on-ramp.The fill consists of medium dense <br /> to dense silty sand with occasional gravel. Boring GEI-20 did not extend through the fill and very dense <br /> glacial till was encountered below the fill in boring GEI-21. <br /> Loose to dense silty sand fill was also encountered on the west side of 1-5 near the southbound on-ramp. <br /> The fill thickness is greater than the depth explored in boring GEI-22 (greater than 161/2 feet), and was <br /> approximately 12 feet in boring GEI-23 which was advanced from a lower elevation below the rockery.Very <br /> dense glacial till underlies the fill in boring GEI-23(beginning at approximately 12 feet below the toe of the <br /> rockery). <br /> Groundwater was encountered in GEI-23 at approximately 15 feet bgs at the time of drilling. Groundwater <br /> was not encountered in the other borings during drilling, however wet soil samples were obtained in GEI-20 <br /> and GEI-22, indicating perched water may be present from 5 to 7 feet bgs in GEI-21 and near the bottom <br /> of the boring in GEI-22. <br /> 128th Street SW at 4th Avenue West <br /> Boring GEI-14 was drilled in the grass in the southwest corner of the intersection of 128th Street SW and <br /> 4th Avenue West as shown on site plan Figure 2M.Approximately 11 feet of loose to medium dense fill with <br /> occasional asphalt debris was encountered overlying medium dense to very dense glacial till. <br /> GEOENGINEERS April 14,2017 : Page 8 <br /> File No.2095-032-00 <br />