Laserfiche WebLink
Start End Total 2.5 Logged By YZ Driller Geologic Drill,Inc. Drilling <br /> Drilled 11/15/2016 11%15/2016 Depth(ft) Checked By NLT g Method Hollow Stem Auger <br /> Surface Elevation(ft) 185 Hammer Rope&Cathead Drilling Deep Rock XL Trailer <br /> Vertical Datum NAVD88 Data 140(lbs)/30(in)Drop Equipment <br /> Latitude 47.82005488 System Geographic Groundwater <br /> Longitude -122.2076117 Datum WGS84 Depth to <br /> Date Measured Water(ftl Elevation(ft) <br /> Notes: None Observed <br /> FIELD DATA <br /> vo s <br /> a y MATERIAL REMARKS <br /> ai <br /> wm °, v DESCRIPTION <br /> _ — <br /> 4.2 a <br /> t /) (� c -E. Q'— C 2 <br /> ra e) Z O N N rD 1=.y O ic ayi c <br /> W D E n m U co 1— 0 U' 0 '8 C O <br /> o <br /> AC Approximately 15 inches of asphalt concrete <br /> pavement <br /> SM Brown silty fine to medium sand with gravel(loose <br /> to medium dense,moist)(fill) <br /> Concrete slab <br /> Hit 3 to 4 inch PVC pipe at TA feet stopped drill <br /> S <br /> 0 <br /> o' <br /> z <br /> 0 <br /> K <br /> o <br /> F <br /> ' <br /> U <br /> W <br /> 0 <br /> O <br /> W <br /> 0 <br /> 0 <br /> a <br /> 0 <br /> v) <br /> y <br /> O <br /> K <br /> W <br /> C9 <br /> z <br /> O <br /> U' <br /> co <br /> IS <br /> E <br /> F- <br /> r <br /> 0 <br /> 0 <br /> ri <br /> z <br /> 0 <br /> Note:See Figure A-1 for explanation of symbols. <br /> .. <br /> Y/ 1 <br /> Log of Boring GEI-5 <br /> Project: Community Transit Swift II <br /> E G EO E N G I N E E RS Project Location: Snohomish County, Washington <br /> Figure A-5 <br /> �` Project Number: 2095-032-00 Sheet 1 of 1 , <br />