Laserfiche WebLink
CI- :LI----- 8AC-6934 B <br /> pipe SUPPORTS /'>0s SNORT <br /> (Set DETAIL AI J RADIUS ELBOW NOTES: <br /> 01 _ __ 1 IWOLIN.IL$$$$$ 1. All piping shown dotted to be furnished by <br /> A� ���-- _-.� installer. Refer to unit certified drawing for <br /> � _��:- `� details on cooling tower inlet sixes, etc. <br /> 1tlt�tdlElll iiINEWWININIIIi 2. Supply piping to cooling tower inlet connections <br /> 1+1I" may be supported from tower structure only at the <br /> not be <br /> "its 1 I �_�I suppo ted by theipe support a tower intiOns let connections. Piping <br /> 1 1 I outside of the perimeter of the tower must not be <br /> frr r(((�(��(/�1 \\\\%%\\ I ' t��� supported from tower. <br /> r.,, ,,,,� 111 ,,H,,� �- 1 �'� 3. Supply piping supports must be designed to rest on <br /> ,, t� -k �'� the walls of the hot ester distribution Dozes. <br /> 11 � i i'^ f1 Bearing surface of the pipe supports on each <br /> I I `� 1 I I I distribution box must be at least 6 inches by <br /> �_,� N I.A 6 inches (See Detail A). <br /> I I �� I 1 (STAT10) n------- 4. Ali piping suppots•to be designed, furnished and <br /> i —i i� 1 . I� S Installed <br /> ns lestxe ofh;nlet headirs. <br /> ng piping that can be <br /> 1 (Yjj supported by Lhe cooling Lower water distribution <br /> 1 _`_ _r- Y A box is Id inches. <br /> e. w� apt PLCVAT10N A-A_ 6. Required statiower is atec pd by xtatic lift head from <br /> bbase of cooling <br /> Ih —.1.-.—.% edit .t♦�4 7. When tower is equipped with safety railing package, <br /> I inlet piping should be designed to insure that it <br /> ►LAN A �8..-40.' clears the railing. Adjust static lift as required. <br /> Recommence man iawR[ ti� B. If BAC vibration isolation rails are furnished._all <br /> S• <br /> 1._, tower supply Piping must be independently supported <br /> sthece no provisionexternal piping in theas n selection ofde for ethheeight of <br /> _k.A vibration isolation rails. <br /> Stt NOTTS S•e <br /> P1 SUPPORTS spa SNORT. aNiotL No. N 9s / <br /> e 1att MAIL Al RADIUS tt.IMm <br /> .____.7. <br /> 'IPS -' Sia a• -'Y" '3-v <br /> .�... Ifo LS.FLANKS �_ Si40 f0'-fyt- s•-s>Iwa'h•-r(rt'��- <br /> �� n -yam __.i.„„.._ .Slee SW By. s w rW'-' <br /> �!I SMa ' '- <br /> ____ . ' ' _. . <br /> •l V News'SW rv-' <br /> ((((((((1 ))))))))) i W enM w w' -v-• 1s' -SW <br /> Am <br /> I �� 1=.=___ <br /> 1 <br /> I " .....__.___ <br /> --- <br /> =-_-_---- - <br /> J_____......, <br /> BALTIMORE AIRCOIL CO., INC <br /> } � 1 <br /> �� <br /> t-_�j (:.... — TYPICAL PIPING FOR <br /> «_� - 1 SINGLE CELL 3000 <br /> T^- '— _-__----- <br /> t tot SUMMON 0-11J.WCM. <br /> I• I 1 tslh <br /> • 12-9-85 <br /> t ,SI BAC-6934 B <br /> ALTERNATE PIPING <br />