Laserfiche WebLink
A4 /8107, ,aft/ <br /> S A 2 A N submittal Review <br /> GROUP <br /> DATE: 3-27-18 <br /> SUBMITTAL NAME: Cooling Towers CT-1 and CT-2 <br /> Greenberry Submittal#02.02.001 R1 <br /> DATE SUBMITTAL 3-13-18 <br /> RECEIVED: <br /> PROJECT NAME: Boeing Bldg 40-02 Cooling Towers Replacement <br /> SAZAN PROJ. NO. : 543-1762 <br /> Ken Billington <br /> REVIEWER: <br /> SIGNED: <br /> Review is only for general conformance with the design concept of the project and <br /> general compliance with the information given in the Contract Documents. Any action <br /> shown is subject to the requirements of the plans and specifications. Contractor is <br /> responsible for: Dimensions which shall be confirmed and correlated at the job site; <br /> fabrication processes and techniques of construction; coordination of his work with that <br /> of all other trades and the satisfactory performance of his work. A copy of this review is <br /> attached to and made a part of each copy of the submittal. <br /> c <br /> 0 <br /> Specification 0. <br /> Reference Description , . e Comments <br /> W ` 4,t <br /> s <br /> o o m L <br /> z v a <br /> 236514.13 Cooling Towers X -Please add a basin <br /> heater failure alarm <br /> (basin low water temp) <br /> point that <br /> communicates back to <br /> BAS. <br /> -Confirm that low <br /> vibration option <br /> complies with section <br /> 236514 2.3.F. Install <br /> fan limit or provide <br /> 600 Stewart St.,Ste 1400 additional vibration <br /> Seattle,Washington 98101 <br /> control if required. <br /> Tel 206.267,1700 <br /> Fax 206.267 1701 <br /> sazan.com Copies returned with review: [1]email+[0]drawings <br /> Page 1 of 2 <br />