Laserfiche WebLink
INSPECTION REPORT <br /> Date q-3""/ 7 Permit: 67 p iJ I.33 <br /> Contractor: <br /> Owner: ry <br /> Site Address: 3Oo3 �as/AAD O"` <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ■ • ., as ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Or G . ❑Drywall Nailing ElPlumbing Final <br /> electrical F,\.I ❑Shear Nailing GAS PIPE <br /> SITE •-• ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> •Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ElPARTIAL APPROVAL FINAL APPROVAL T- - • -u T <br /> El OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> E, OK FOR C.O. LIVIOLATION e, <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector:��.. Date: _01 <br /> EIR(10/06) DATABAR,INC. <br />