Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 5/29/2019 14:19 <br /> Issued By EAL ERICKSON,ANDREW L. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/1/2019 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 17 3 <br /> Title CONVERT.75 INCH 12 74TH ST SW UT3473-17-3 <br /> Work Order No 20191312 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/1/2019 Time 08:04 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS1284K030 WASRVC YES 5/1/2019 <br /> Address 12 74TH ST SW <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 12 74TH ST S.W. <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 15.628 05/13/2019 PM <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 3 45.831 05/13/2019 PM <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 74.813 05/13/2019 PAP <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.78 05/13/2019 PM <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 2 7.67 05/13/2019 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 202.668 05/13/2019 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .954 05/13/2019 PAP <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7 NO LEG LENGTH VINO 1 100.935 05/13/2019 PAP <br /> Total Material Cost $4"60.28 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .5 12.81 05/13/2019 <br /> Total NA Cost $12.81 <br /> Total Cost $473.09 <br />