My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019/06/19 Council Agenda Packet
>
Council Agenda Packets
>
2019
>
2019/06/19 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2019 9:29:11 AM
Creation date
6/21/2019 9:27:26 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plan Section 2 <br /> Description of Improvements and Details <br /> 2.1 Overpass or. Underpass at Pigeon Creek No. 1 <br /> Future improvements in this area could include interpretive signs, restrooms, and <br /> additional park improvements, such as benches. Designs for the proposed public access <br /> at Meadowdale Beach Park should be evaluated for applicability to an undercrossing at <br /> Pigeon Creek. The drawing below illustrates an undercrossing of the railroad tracks to <br /> reach the beach at the end of the service road that parallels Pigeon Creek No. 1. <br /> �fss� <br /> Tsfo `D i- ! pQ Edi <br /> • • • v <br /> tip. _ i <br /> yW` <br /> • f,../xiw7z7 <br /> 2.2 Trail Along South Pigeon Creek No. 1 to Terminal Ave., As a <br /> condition of approval of a shoreline substantial development permit for its Marine <br /> Terminal Improvements at the Port's Hewitt Terminal facility, the Port <br /> constructed a paved walkway running along the east side of the property to an upland area <br /> adjacent to Pigeon Creek No. 1 with beach access and a picnic area and viewpoint. <br /> 2.3 Terminal Avenue to Everett Avenue Connection— <br /> The 25th Street ped/bike overcrossing at W. Marine View Dr. is now complete. It connects <br /> Terminal Avenue with an overcrossing of the railroad tracks to Everett Avenue and the <br /> downtown. <br /> 12 <br /> Shoreline Public Access Plan Update 2019 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.