Laserfiche WebLink
4 ? <br /> Memo <br /> 18 October 2017 <br /> To <br /> City of EVERETT-Jeff Heilman <br /> 3200 Cedar St. <br /> Everett,WA 98201 <br /> From the Architect <br /> Jeffrey Almeter <br /> 9506 13th Ave NW <br /> Seattle, WA 98117 <br /> For the Project <br /> 6002 Commercial Ave Unit B <br /> Everett,WA 98201 <br /> General Description <br /> Below are responses to the letter from Jeff Heilman dated 16 October 2017. <br /> 1. Please see revised Architectural Drawings and Structural Drawings(marked up by the architect) for clarification <br /> 2. Please see Detail#5 on page A1.8 for Stair Section details and dimensions. Please see handrail notes on A1.2+ <br /> A1.3 for rail returns <br /> 3. Please see page DETAIL#1 A1.8 for guard+rail details for intermediate balusters <br /> 4. Please see South Elevation page A1.4 and page A1.8 for rail spacing to meet code requirements <br /> 5. Please see page A1.8 for stair opening dimensions <br /> 6. Please see A1.2 for landing at bottom of stair <br /> 7. Please see Foundation+Deck Framing Plans-S4 for support at center stringer.See S4+C/S6 for revised stringer <br /> connections <br /> 8. Please see marked details by Architect for flashing information A1.9 <br /> 9. Please see A 1.2,A1.3,and details A1.8+A1.9 for decking material <br /> 10. Please see detail#5 on page A1.8 for nosing dimensions <br /> fiRC 0 EV <br /> OCT 232017 <br /> CITY of EVERETT <br /> Permit Services <br /> Page 1 of 1 <br />