"glid---4
<br /> UTIL11 V &- SYSTEM DEVELOPMENT FEES
<br /> (effi 1 9) WATER FEES (EMC 14.16.712)
<br /> "----" Meter Size Meter Only Complete Service
<br /> 3/4" I $ 520 I $ 3,135
<br /> 1" dom/fire combo meter* (SFR/Duplex) I $ 605 I $ 3,135
<br /> 1" $ 605 I $ 3,135
<br /> 14/2" or 2" $ 1,071 I $ 4,625
<br /> Larger Services* *Per Cost Estimate prepared by the Water Department
<br /> Backflow Devices
<br /> (outside of bldg in vault/hotbox:.DCDA_for fire, DCVA for dom/irr, RPBA for-.domestic) $ _. 35
<br /> ce_ffl%i/2019). ___:-=_:..-___:_:-__-_-......._ -_ - - 'SEWER FEES (EMC 14.08.140)
<br /> New Connection to sewer main I $ 60 plus $10 per bldg connection to side sewer
<br /> Re-connection to existing stub I $ 60
<br /> Backwater Valve Installation I $ 30
<br /> Side Sewer Alteration/ Repair I $ 30
<br /> Side Sewer Cap-off I $ 10
<br /> (eff 1/1/2019) SYSTEM DEVELOPMENT FEES (EMC14.08.135)
<br /> Everett's water,sewer,and stormwater connection charges are designed to ensure new customers bear their equitable share of the cost to develop
<br /> the utility system(s).Water and Sewer fees are set based on the water meter size and/or the associated demand on the system(s)for developments
<br /> exceeding 15,000 cubic feet/month. Stormwater fees are based on impervious area.See Administrative Guidelines on Page 2.
<br /> Water&Sewer System Development Fees: (Assessed on Utility Permits due at permit issuance)
<br /> Meter Size Water Sewer Total
<br /> 3/4" -$ - - -3,957 $ __ _ 5,121 $ _ 9,078
<br /> 1" dom/fire combo* (SFR/Duplex) $ 3,957 $ 5,121 $ 9,078
<br /> 1" $ 6,608 $ 8,552 $ 15,160
<br /> 1-1/2" $ 13,176 $ 17,053 $ 30,229
<br /> 2" $ 21,090 $ 27,295 $ 48,385
<br /> 3" $ 39,570 $ 51,210 /$ 90,780
<br /> 4" $ 65,961 $ 85,367 $ 151,328
<br /> 6" $ 131,883 $ 170,683 $ 302,566
<br /> 8" $ 211,021 $ 273,103 $ :84,124
<br /> 10" $ 303,375 I $ 392,627 $ 696,002
<br /> 12" $ 445,151 1 $ 576,113 $ 1,021,264
<br /> "Domestic/Fire combination meter for Single Family Residences and Duplexes reviewed under the International Residential Code(IRC),upsized due to
<br /> `he addition of a fire sprinkler system.
<br /> "Fees are calculated and due at the time the permit is issued.
<br /> "Homes outside city limits but connected to Everett's water/sewer system(s)are assessed a 25%surcharge.
<br /> Stormwater System Development Fees: (Assessed on Building Permits,or PW Permit if no building permit-due at permit issuance)
<br /> Development Type - - Stormwater System Development Fee
<br /> Vew Construction/Redevelopment Base Fee (1 ISU less than-or equal to 2500sf) $622.00
<br /> Additional Charge for impervious area* >2500sf $0.2487/sf
<br /> xisting Development adding new impervious area Per square foot of added impervious area* $0.2487/sf
<br /> SU=lmpevious Surface Unit,defined as 2500sf of impervious surface area.
<br /> 'Impervious Area as stated in the Administrative Guidelines.
<br /> VOTE:Administrative Guidelines for System Development Fees on Page 2. Page 1 of 2
<br /> CITY OF EVERETT PERMIT SERVICES I 3200 CEDAR ST,EVERETT,WA 98201 1425-257-8810
<br /> erettwa.gov/permits everetteps@everettwa.gov
<br />
|