Laserfiche WebLink
4/23/2019 Page 1 <br /> City of Everett <br /> 8:45:25AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. BW1607-004 Site Address 2901 EVERETT AVE <br /> Applied 7/27/2016 Applicant Lot <br /> Approved 9/16/2016 Owner CLEAN SLATE HOUSE LLC Block <br /> Issued 9/20/2016 Contractor TENANT/W LETTER Tract <br /> Parent Permit No. Description CONVERT TO A 10 ROOM ROOMING HOUSE <br /> Notes PRIOR TO FINAL:PLANNING INSPECTION FOR OFF-STREET PARKING AND REQD <br /> SCREENING.CONTACT GRACE POLLARD @ 425-257-8807;FIRE INSPECTION. <br /> THIS PERMIT MUST BE FINALED!!! <br /> Scheduled Completed Tvpe Inspector Result Remarks Inspector's Comments <br /> 10/11/2016 12/12/2018 Site Visit DWF PartialApproval See notes Bedroom#1-#18 room. <br /> Enlarge room to minimum standards 70 sq <br /> ft+. Ok to occupy subject to Fire Dept sign <br /> off alarms,etc. <br /> 9/5/2017 12/21/2018 Letter KLC Expired permit,14 <br /> day grace period <br /> 9/8/2017 9/8/2017 Permit Extension TAH Approval extended to <br /> 03/07/2018 <br /> 6/25/2018 6/25/2018 PERMIT TMB OTHER See notes Per consultation with Code Officer D.L.- <br /> EXTENSION OK to extend permit for 180 days. <br /> 7/2/2018 7/2/2018 SITE VISIT TMB CORRECTION Partial approval/correction requested: <br /> -Basement:reinforce handrail brackets <br /> -Mainfloor:complete door between room 4 <br /> and living room per plan. <br /> Loft area:not approved for habitable space <br /> at this time(not occupied at this time.) <br /> -Please reinforce handrail to basement <br /> steps,exterior. <br /> -Parking improvements-pending <br /> completion. <br /> 7/12/2018 7/12/2018 BLDG 13-OTHER TMB PARTIAL APPR 1.Handrails and paving are complete. <br /> 2.Complete removal of the attic kitchen <br /> and laundry as discussed. <br /> 3.Obtain public works inpsection approval. <br /> 7/19/2018 7/19/2018 BLDG 14-FINAL TMB CORRECTION 1.Kitchen and bath has been removed at <br /> loft/attic.This area is not occupied or <br /> habitable. <br /> 2.Increase the headroom at basement <br /> stairway as discussed. <br /> 3.Complete parking striping <br /> 4.Complete landscaping per planning <br /> department requirements. <br /> 7/30/2018 7/30/2018 BLDG TMB PARTIAL APPR Consultation about framing at stairway to <br /> 01-CONSULTATIO improve headroom and final inspection <br /> requirements. <br /> 12/18/2018 12/18/2018 BLDG TMB CORRECTION Obtain planning department approvals. <br /> 01-CONSULTATIO (final) <br /> Obtain fire department inspection and <br /> approvals. <br /> Obtain public works final inspection <br /> approval. <br /> Obtain required approvals for the irrigation <br /> system. <br /> *Call for final building inspection when <br /> above approvals have been granted. <br /> 3/6/2019 3/6/2019 PLANNING GEP APPROVAL <br /> LANDSCAPING <br /> 3/14/2019 3/14/2019 BLDG 15-FINAL TMB APPROVAL (3/14/2019 4:30 PM TMB) <br /> Ok for Certificate of Occupancy. <br /> 3/14/2019 3/14/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 4/10/2019 4/22/2019 CERTIFICATE OF TKJ APPROVAL <br /> OCCUPANCY <br /> INSP12CRWsYsTEMS <br />