Laserfiche WebLink
INSPECTION REPORT <br /> /s j ��f, <br /> v, 7 Date ( Permit: f-lam-'1---026- <br /> -47...- <br /> Contractor: <br /> ---Contractor: <br /> 3is,..,/\1\1\ - Owner: VO9 ASS6Ciatf_ S <br /> Site Address: __J502, e. __ ' NI Way <br /> y <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In j . tural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service L; raming ❑Rooftop Units ❑Water Service <br /> ❑Grounding Y Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roo Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drainseilinnGGrid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building mal ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: 2 1-1,2")2, <br /> ❑ APPROVAL ❑ PARTI APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. RECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> 1E4=5 O E <br /> )257-8881PERFORM FMO REINSPECTION NC –24 hour notice required <br /> es-y-2,-r,/C' & R i',fl <br /> w�D to J '/i <br /> • IAjeev f . _aF_ <br /> s`r ° �rs,� r <br /> d <br /> Are rg s-E-7s;iv;c Pc I/(elff ti <br /> J6 o ,3 e--- s,'tj4-d, /11 7b <br /> ry-r-v S 5, / tp <br /> Inspector: D, Date: <br /> EIR(10/06) DATABAR,INC. <br />